Information Journal Paper
APA:
CopyGHASEMI, M., & MIRMOHAMMADI, S.H.. (2018). LOT SIZING IN A SUPPLY CHAIN SCHEDULING IN A TWO-ITEMS PRODUCTION SYSTEM WITH REWORK. INDUSTRIAL ENGINEERING & MANAGEMENT SHARIF (SHARIF: ENGINEERING), 34-1(1/2 ), 43-53. SID. https://sid.ir/paper/107692/en
Vancouver:
CopyGHASEMI M., MIRMOHAMMADI S.H.. LOT SIZING IN A SUPPLY CHAIN SCHEDULING IN A TWO-ITEMS PRODUCTION SYSTEM WITH REWORK. INDUSTRIAL ENGINEERING & MANAGEMENT SHARIF (SHARIF: ENGINEERING)[Internet]. 2018;34-1(1/2 ):43-53. Available from: https://sid.ir/paper/107692/en
IEEE:
CopyM. GHASEMI, and S.H. MIRMOHAMMADI, “LOT SIZING IN A SUPPLY CHAIN SCHEDULING IN A TWO-ITEMS PRODUCTION SYSTEM WITH REWORK,” INDUSTRIAL ENGINEERING & MANAGEMENT SHARIF (SHARIF: ENGINEERING), vol. 34-1, no. 1/2 , pp. 43–53, 2018, [Online]. Available: https://sid.ir/paper/107692/en