مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

745
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

265
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

OPTIMAL LOT-SIZING DECISIONS WITH INTEGRATED PURCHASING, MANUFACTURING AND ASSEMBLING FOR REMANUFACTURING SYSTEMS

Pages

  1-26

Abstract

 This work applies fuzzy sets to the integration of purchasing, manufacturing and assembling of production planning decisions with multiple suppliers, multiple components and multiple machines in remanufacturing systems. The developed FUZZY MULTI-OBJECTIVE LINEAR PROGRAMMING model (FMOLP) simultaneously minimizes total costs, total CO2 emissions and total lead time with reference to customer demand, due date, supplier/manufacturer capacity, lot-size release and machine yield. The proposed FMOLP model provides a RECOVERABLE REMANUFACTURING framework that facilitates fuzzy decision-making, enabling the decision maker (DM) to adjust interactively the membership function or parameters during the solution procedure to obtain a preferred and satisfactory solution. To test the model, it was implemented in various scenarios with a remanufacturing production system. The analytical results in this work can help planner by enabling systematic analysis of the cost-effectiveness of remanufacturing systems and their potential for improving CO2 emissions and lead time in terms of remanufacturing planning. Future investigations may apply the related patterns of non-linear membership functions to develop an actual remanufacturing planning decision.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    SU, TAI SHENG. (2018). OPTIMAL LOT-SIZING DECISIONS WITH INTEGRATED PURCHASING, MANUFACTURING AND ASSEMBLING FOR REMANUFACTURING SYSTEMS. IRANIAN JOURNAL OF FUZZY SYSTEMS, 15(3 ), 1-26. SID. https://sid.ir/paper/113255/en

    Vancouver: Copy

    SU TAI SHENG. OPTIMAL LOT-SIZING DECISIONS WITH INTEGRATED PURCHASING, MANUFACTURING AND ASSEMBLING FOR REMANUFACTURING SYSTEMS. IRANIAN JOURNAL OF FUZZY SYSTEMS[Internet]. 2018;15(3 ):1-26. Available from: https://sid.ir/paper/113255/en

    IEEE: Copy

    TAI SHENG SU, “OPTIMAL LOT-SIZING DECISIONS WITH INTEGRATED PURCHASING, MANUFACTURING AND ASSEMBLING FOR REMANUFACTURING SYSTEMS,” IRANIAN JOURNAL OF FUZZY SYSTEMS, vol. 15, no. 3 , pp. 1–26, 2018, [Online]. Available: https://sid.ir/paper/113255/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button