مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,045
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

PRODUCTIVITY MODEL AND COST OF STEEL TRACKED SKIDDER LTT-100A IN DOWNWARD SKIDDING (CASE STUDY: RESEARCH AND EDUCATIONAL FOREST OF UNIVERSITY OF TARBIAT MODARES)

Pages

  243-252

Abstract

 Nowadays, with mechanization development, evaluation of machine productivity and calculation of average cost of skidding for each hour and each cubic meter is necessary to compare their efficiency. In this study, the mathematical model of production and cost of STEEL TRACKED SKIDDER LTT-100A was studied in Tarbiat Modares University Experimental Forest (TMUF). Continuous TIME STUDY was applied during skidding operation to record the time spent for each component of skidding. The obtained data was then analyzed using multivariable regression analysis to build the mathematical model of production. Results showed that skidding distance, skid trail slope and volume of logs at each cycle are significant variables influencing skidding time. The share of delay was 14.94 % of total time while 44% of delays time was identified as technical delay (unavoidable delay), personal and operational delay were recorded 33% and 21% percent, respectively. Skidder productivity regardless of delay time and effective time were calculated 5.84 m3/h and 4.98 m3/h, respectively. Total average cost of system was estimated 265678 RLS/h and 54330 RLS/m3, respectively (Rials= 50cent).

Cites

  • No record.
  • References

    Cite

    APA: Copy

    GILANIPOOR, N., NAJAFI, A., & HESHMATALVAEZIN, S.M.. (2012). PRODUCTIVITY MODEL AND COST OF STEEL TRACKED SKIDDER LTT-100A IN DOWNWARD SKIDDING (CASE STUDY: RESEARCH AND EDUCATIONAL FOREST OF UNIVERSITY OF TARBIAT MODARES). IRANIAN JOURNAL OF FOREST, 4(3), 243-252. SID. https://sid.ir/paper/123208/en

    Vancouver: Copy

    GILANIPOOR N., NAJAFI A., HESHMATALVAEZIN S.M.. PRODUCTIVITY MODEL AND COST OF STEEL TRACKED SKIDDER LTT-100A IN DOWNWARD SKIDDING (CASE STUDY: RESEARCH AND EDUCATIONAL FOREST OF UNIVERSITY OF TARBIAT MODARES). IRANIAN JOURNAL OF FOREST[Internet]. 2012;4(3):243-252. Available from: https://sid.ir/paper/123208/en

    IEEE: Copy

    N. GILANIPOOR, A. NAJAFI, and S.M. HESHMATALVAEZIN, “PRODUCTIVITY MODEL AND COST OF STEEL TRACKED SKIDDER LTT-100A IN DOWNWARD SKIDDING (CASE STUDY: RESEARCH AND EDUCATIONAL FOREST OF UNIVERSITY OF TARBIAT MODARES),” IRANIAN JOURNAL OF FOREST, vol. 4, no. 3, pp. 243–252, 2012, [Online]. Available: https://sid.ir/paper/123208/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button