Information Journal Paper
APA:
CopySHAKERI, E., AFSHAR, M.R., & AMIRI, O.. (2016). CHALLENGES OF APPLYING THE OVERHEAD COST FACTORS IN BIDDINGS OF CONSTRUCTION PROJECTS. SHARIF: CIVIL ENINEERING, 32-2(3.1), 131-144. SID. https://sid.ir/paper/128167/en
Vancouver:
CopySHAKERI E., AFSHAR M.R., AMIRI O.. CHALLENGES OF APPLYING THE OVERHEAD COST FACTORS IN BIDDINGS OF CONSTRUCTION PROJECTS. SHARIF: CIVIL ENINEERING[Internet]. 2016;32-2(3.1):131-144. Available from: https://sid.ir/paper/128167/en
IEEE:
CopyE. SHAKERI, M.R. AFSHAR, and O. AMIRI, “CHALLENGES OF APPLYING THE OVERHEAD COST FACTORS IN BIDDINGS OF CONSTRUCTION PROJECTS,” SHARIF: CIVIL ENINEERING, vol. 32-2, no. 3.1, pp. 131–144, 2016, [Online]. Available: https://sid.ir/paper/128167/en