Information Journal Paper
APA:
CopyASLANI, BABAK, ZANDIEH, MOSTAFA, & ADELI, MAJID. (2015). BI-OBJECTIVE SCHEDULING OF NO WAIT FLEXIBLE FLOW LINES WITH A TIME WINDOW AND THE POSSIBILITY OF WORK REJECTING. JOURNAL OF INDUSTRIAL MANAGEMENT, 7(3 ), 445-468. SID. https://sid.ir/paper/139964/en
Vancouver:
CopyASLANI BABAK, ZANDIEH MOSTAFA, ADELI MAJID. BI-OBJECTIVE SCHEDULING OF NO WAIT FLEXIBLE FLOW LINES WITH A TIME WINDOW AND THE POSSIBILITY OF WORK REJECTING. JOURNAL OF INDUSTRIAL MANAGEMENT[Internet]. 2015;7(3 ):445-468. Available from: https://sid.ir/paper/139964/en
IEEE:
CopyBABAK ASLANI, MOSTAFA ZANDIEH, and MAJID ADELI, “BI-OBJECTIVE SCHEDULING OF NO WAIT FLEXIBLE FLOW LINES WITH A TIME WINDOW AND THE POSSIBILITY OF WORK REJECTING,” JOURNAL OF INDUSTRIAL MANAGEMENT, vol. 7, no. 3 , pp. 445–468, 2015, [Online]. Available: https://sid.ir/paper/139964/en