مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,465
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

549
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

INTRODUCING NEW EQUATION FOR PREDICTING PENETRATION RATE OF TUNNEL BORING MACHINE

Pages

  313-322

Abstract

 Tunnel Boring Machines (TBM) is among the most important machines for tunnel excavation purposes. Evaluation of the performance of these machines for excavation is of special importance due to the high cost of these machines. Prediction of the PENETRATION RATE is one of the indicators in evaluation of TBMs. There are various methods and equations for predicting the PENETRATION RATE, which are based on parameters related to the ROCK mass and specifications of the machine, and each of them has its own particular characteristics. Multivariable linear regressions, artificial neural networks, and adaptive neuro-fuzzy inference systems are among the highly efficient modeling and data pattern recognition methods. In this research, some equations have been proposed for predicting the PENETRATION RATE in ZAGROS I Tunnel by employing multivariable linear regression method and by considering the key parameters of the ROCK mass and the specifications of the TBM; the best equation was selected according to the results of statistical analysis. For verifying the validity of this equation, the PENETRATION RATE was calculated at certain parts of Ghomrood Tunnel. In comparison with the real values and results of other models, the outcomes of calculations indicated that predicted values for the PENETRATION RATE are of acceptable accuracy.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    HOSSEINI, M., & HOSSEINI, S.J.. (2017). INTRODUCING NEW EQUATION FOR PREDICTING PENETRATION RATE OF TUNNEL BORING MACHINE. AMIRKABIR JOURNAL OF CIVIL ENGINEERING (AMIRKABIR), 49(2 ), 313-322. SID. https://sid.ir/paper/165834/en

    Vancouver: Copy

    HOSSEINI M., HOSSEINI S.J.. INTRODUCING NEW EQUATION FOR PREDICTING PENETRATION RATE OF TUNNEL BORING MACHINE. AMIRKABIR JOURNAL OF CIVIL ENGINEERING (AMIRKABIR)[Internet]. 2017;49(2 ):313-322. Available from: https://sid.ir/paper/165834/en

    IEEE: Copy

    M. HOSSEINI, and S.J. HOSSEINI, “INTRODUCING NEW EQUATION FOR PREDICTING PENETRATION RATE OF TUNNEL BORING MACHINE,” AMIRKABIR JOURNAL OF CIVIL ENGINEERING (AMIRKABIR), vol. 49, no. 2 , pp. 313–322, 2017, [Online]. Available: https://sid.ir/paper/165834/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button