Information Journal Paper
APA:
CopyKALANTARI, M., & FATEMI GHOMI, S.M.T.. (2010). COMPARISON OF ESTIMATORS OF STANDARD DEVIATION, MEAN MOVING RANGE AND MEDIAN MOVING RANGE TO ESTIMATE PROCESS STANDARD DEVIATION USING AUTOCORRELATED DATA (TECHNICAL NOTE). ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), 44(1), 89-95. SID. https://sid.ir/paper/166404/en
Vancouver:
CopyKALANTARI M., FATEMI GHOMI S.M.T.. COMPARISON OF ESTIMATORS OF STANDARD DEVIATION, MEAN MOVING RANGE AND MEDIAN MOVING RANGE TO ESTIMATE PROCESS STANDARD DEVIATION USING AUTOCORRELATED DATA (TECHNICAL NOTE). ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING)[Internet]. 2010;44(1):89-95. Available from: https://sid.ir/paper/166404/en
IEEE:
CopyM. KALANTARI, and S.M.T. FATEMI GHOMI, “COMPARISON OF ESTIMATORS OF STANDARD DEVIATION, MEAN MOVING RANGE AND MEDIAN MOVING RANGE TO ESTIMATE PROCESS STANDARD DEVIATION USING AUTOCORRELATED DATA (TECHNICAL NOTE),” ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), vol. 44, no. 1, pp. 89–95, 2010, [Online]. Available: https://sid.ir/paper/166404/en