مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,673
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

NEW METHOD TO DETERMINE BUFFER SIZE FOR HIGH RISK PROJECT ENVIRONMENT IN CRITICAL CHAIN METHOD

Pages

  83-94

Abstract

 In this research, a method for determining FEEDING BUFFER sizes in critical chain PROJECT SCHEDULING is introduced. The method integrates project characteristics into the formulation as well as environment PROJECT RISK. Resource tightness, environment risk and network morphology incorporate into the formulation. The method is tested and compared to three commonly suggested methods in the literature, the cut and paste method, the root square error method and adaptive procedure with resource tightness.The comparison is done by means of a simulation study using the kolicsh hartman data set. The test results indicate that all of the suggested methods generate better buffer sizes; therefore, they provide sufficient protection against the delays in project completion time.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    MANSOURIAN, F., IRANMANESH, S.H., & TABESH, M.. (2009). NEW METHOD TO DETERMINE BUFFER SIZE FOR HIGH RISK PROJECT ENVIRONMENT IN CRITICAL CHAIN METHOD. ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), 43(1), 83-94. SID. https://sid.ir/paper/166407/en

    Vancouver: Copy

    MANSOURIAN F., IRANMANESH S.H., TABESH M.. NEW METHOD TO DETERMINE BUFFER SIZE FOR HIGH RISK PROJECT ENVIRONMENT IN CRITICAL CHAIN METHOD. ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING)[Internet]. 2009;43(1):83-94. Available from: https://sid.ir/paper/166407/en

    IEEE: Copy

    F. MANSOURIAN, S.H. IRANMANESH, and M. TABESH, “NEW METHOD TO DETERMINE BUFFER SIZE FOR HIGH RISK PROJECT ENVIRONMENT IN CRITICAL CHAIN METHOD,” ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), vol. 43, no. 1, pp. 83–94, 2009, [Online]. Available: https://sid.ir/paper/166407/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top