Information Journal Paper
APA:
CopyNabipoor Afruzi, Elham, & AGHAIE, ABDOLLAH. (2018). Robust Optimization of Resource-constrained Multi-Project Scheduling Problem with Uncertain Activities Duration. ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), 52(2 ), 291-307. SID. https://sid.ir/paper/166438/en
Vancouver:
CopyNabipoor Afruzi Elham, AGHAIE ABDOLLAH. Robust Optimization of Resource-constrained Multi-Project Scheduling Problem with Uncertain Activities Duration. ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING)[Internet]. 2018;52(2 ):291-307. Available from: https://sid.ir/paper/166438/en
IEEE:
CopyElham Nabipoor Afruzi, and ABDOLLAH AGHAIE, “Robust Optimization of Resource-constrained Multi-Project Scheduling Problem with Uncertain Activities Duration,” ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), vol. 52, no. 2 , pp. 291–307, 2018, [Online]. Available: https://sid.ir/paper/166438/en