مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

4,480
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

OPTIMIZING THE RESOURCE ALLOCATION OF PROJECT ACTIVITIES USING CRD METHOD

Pages

  37-46

Abstract

 In the process of effective and optimized planning and control, in order to manage the project, it is necessary to consider all the project aspects. Common techniques of project scheduling and control such as CPM and PERT assume unlimited resource availability in project network analysis, Developed networks due to theory derived of this techniques are networks that deal with time optimization of the activities. Consequently in this schedule and control methods, it is possible that during the project performance in some time periods, requirement to one or more resources is higher than the availability level or include more resource fluctuations. It can finally convert the project into an uneconomical project by a negative time and cost trade off or cause considerable deliveries in project performance time. This paper presents a technical method for controlling and optimizing RESOURCE ALLOCATION to project activities, This technique as an extension to the basic CPM and PERT approach presents a simple method for controlling the project schedule of RESOURCE ALLOCATION by considering their constraints and causes the optimized and efficient distribution of tasks to PROJECT LEVELS, Finally by avoiding the simultaneous unnecessary use of several activates of a critical resource and by generating efficient LEVELS OF RESOURCE AVAILABILITY, it optimizes the project approaches.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    NADERPOUR, A., & MOFID, M.. (2010). OPTIMIZING THE RESOURCE ALLOCATION OF PROJECT ACTIVITIES USING CRD METHOD. JOURNAL OF MODELING IN ENGINEERING, 7(19), 37-46. SID. https://sid.ir/paper/173841/en

    Vancouver: Copy

    NADERPOUR A., MOFID M.. OPTIMIZING THE RESOURCE ALLOCATION OF PROJECT ACTIVITIES USING CRD METHOD. JOURNAL OF MODELING IN ENGINEERING[Internet]. 2010;7(19):37-46. Available from: https://sid.ir/paper/173841/en

    IEEE: Copy

    A. NADERPOUR, and M. MOFID, “OPTIMIZING THE RESOURCE ALLOCATION OF PROJECT ACTIVITIES USING CRD METHOD,” JOURNAL OF MODELING IN ENGINEERING, vol. 7, no. 19, pp. 37–46, 2010, [Online]. Available: https://sid.ir/paper/173841/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button