Information Journal Paper
APA:
CopyENSHAEE, A., HOOSHMAND, R., & HAGHIGHATDAR FESHARAKI, F.. (2011). OPTIMAL PMU PLACEMENT FOR MAINTAINING FULL NETWORK OBSERVABILITY DURING SINGLE OUTAGE OF LINES. COMPUTATIONAL INTELLIGENCE IN ELECTRICAL ENGINEERING (INTELLIGENT SYSTEMS IN ELECTRICAL ENGINEERING), 2(2), 25-36. SID. https://sid.ir/paper/203121/en
Vancouver:
CopyENSHAEE A., HOOSHMAND R., HAGHIGHATDAR FESHARAKI F.. OPTIMAL PMU PLACEMENT FOR MAINTAINING FULL NETWORK OBSERVABILITY DURING SINGLE OUTAGE OF LINES. COMPUTATIONAL INTELLIGENCE IN ELECTRICAL ENGINEERING (INTELLIGENT SYSTEMS IN ELECTRICAL ENGINEERING)[Internet]. 2011;2(2):25-36. Available from: https://sid.ir/paper/203121/en
IEEE:
CopyA. ENSHAEE, R. HOOSHMAND, and F. HAGHIGHATDAR FESHARAKI, “OPTIMAL PMU PLACEMENT FOR MAINTAINING FULL NETWORK OBSERVABILITY DURING SINGLE OUTAGE OF LINES,” COMPUTATIONAL INTELLIGENCE IN ELECTRICAL ENGINEERING (INTELLIGENT SYSTEMS IN ELECTRICAL ENGINEERING), vol. 2, no. 2, pp. 25–36, 2011, [Online]. Available: https://sid.ir/paper/203121/en