مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,442
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

PRESENTATION AND SOLUTION OF CRITICAL CHAIN PROJECT SCHEDULING PROBLEM (CCPSP) MODEL WITH CONSIDERATION OF FEEDING BUFFER

Pages

  31-59

Abstract

 During the recent years, extensive research has been done on the field of project scheduling. There is always uncertainty in the area of project scheduling that causes a deviation in the real plan from the scheduled plan. One of the solutions to deal with this uncertainty is using the CRITICAL CHAIN METHOD (CCM) in project scheduling. This method which is derived from the theory of constraints (TOC) is a new method in project control which was first proposed by Goldartt in 1997.In this research we attempt to use the principals of critical chain in resource-constrained project scheduling problem. The main innovation in this research is presentation of critical chain project scheduling problem model with consideration of FEEDING BUFFER and using FLOAT as a supplement for FEEDING BUFFER. For this matter, the project scheduling under resources constraints with critical chain approach was first written and its reliability was evaluated using the Lingo software. In the next step the solution algorithm of this model was developed using the GENETIC ALGORITHM and finally different sample issues were investigated. The results of this research show the efficiency of the presented GENETIC ALGORITHM.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    ALEMTABRIZ, AKDAR, AYOUGH, ASHKAN, & BANIASADI, MAHDIE. (2016). PRESENTATION AND SOLUTION OF CRITICAL CHAIN PROJECT SCHEDULING PROBLEM (CCPSP) MODEL WITH CONSIDERATION OF FEEDING BUFFER. JOURNAL OF INDUSTRIAL MANAGEMENT STUDIES, 14(42 ), 31-59. SID. https://sid.ir/paper/213282/en

    Vancouver: Copy

    ALEMTABRIZ AKDAR, AYOUGH ASHKAN, BANIASADI MAHDIE. PRESENTATION AND SOLUTION OF CRITICAL CHAIN PROJECT SCHEDULING PROBLEM (CCPSP) MODEL WITH CONSIDERATION OF FEEDING BUFFER. JOURNAL OF INDUSTRIAL MANAGEMENT STUDIES[Internet]. 2016;14(42 ):31-59. Available from: https://sid.ir/paper/213282/en

    IEEE: Copy

    AKDAR ALEMTABRIZ, ASHKAN AYOUGH, and MAHDIE BANIASADI, “PRESENTATION AND SOLUTION OF CRITICAL CHAIN PROJECT SCHEDULING PROBLEM (CCPSP) MODEL WITH CONSIDERATION OF FEEDING BUFFER,” JOURNAL OF INDUSTRIAL MANAGEMENT STUDIES, vol. 14, no. 42 , pp. 31–59, 2016, [Online]. Available: https://sid.ir/paper/213282/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button