مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,275
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

INCORPORATION OF FUZZY SETS AND EARNED VALUE MANAGEMENT INTO A COST-TIME TRADE-OFF MODEL

Pages

  23-40

Abstract

 Time-cost trade-off (TCT) problem is a well-known subject in the project scheduling contexts. None of previous studies in this area of research emphasize on the incorporation of the TCT problem into the started project’s performance in order to present a comprehensive model for scheduling and controlling the project in its whole life. The aim of this paper is to provide a novel control mechanism which includes scheduling the project prior to start date, monitoring the project’s performance through the execution, predicting future performance of the project, determining the necessity for re-scheduling, and providing an approach for re-scheduling of the project. In the proposed model, several options with specific time and cost have been considered for the initiation of each activity. These options make different paths for the construction of the project. Due to vagueness and imprecision presented in real case projects, the time and cost behavior for each option has been presumed as fuzzy numbers. EARNED VALUE MANAGEMENT (EVM) has been then utilized for measuring project performance and ultimately, statistical modeling has been also employed in predicting the future trend of EVM’s indices. The model has resulted in selection of the best path for implementation purpose among all available paths. Moreover, the proposed model provides the advantage of assessing the possibility of rescheduling process. An illustrative case has been studied to analyze the application of the proposed model.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    SALARI, MOSTAFA, BAGHERPOUR, MORTEZA, TAGHIZADEH, KAVEH, & MONEM, HADI. (2014). INCORPORATION OF FUZZY SETS AND EARNED VALUE MANAGEMENT INTO A COST-TIME TRADE-OFF MODEL. PRODUCTION AND OPERATIONS MANAGEMENT, 4(2 (7)), 23-40. SID. https://sid.ir/paper/217557/en

    Vancouver: Copy

    SALARI MOSTAFA, BAGHERPOUR MORTEZA, TAGHIZADEH KAVEH, MONEM HADI. INCORPORATION OF FUZZY SETS AND EARNED VALUE MANAGEMENT INTO A COST-TIME TRADE-OFF MODEL. PRODUCTION AND OPERATIONS MANAGEMENT[Internet]. 2014;4(2 (7)):23-40. Available from: https://sid.ir/paper/217557/en

    IEEE: Copy

    MOSTAFA SALARI, MORTEZA BAGHERPOUR, KAVEH TAGHIZADEH, and HADI MONEM, “INCORPORATION OF FUZZY SETS AND EARNED VALUE MANAGEMENT INTO A COST-TIME TRADE-OFF MODEL,” PRODUCTION AND OPERATIONS MANAGEMENT, vol. 4, no. 2 (7), pp. 23–40, 2014, [Online]. Available: https://sid.ir/paper/217557/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button