Information Journal Paper
APA:
CopyHASANI, ALIAKBAR. (2019). Multi-Objective Hybrid Metaheuristic Search Algorithm for Distributed Reentrant Permutation Flow Shop Scheduling Via Considering Preventive Maintenance under Uncertainty. PRODUCTION AND OPERATIONS MANAGEMENT, 9(2 (17) ), 1-22. SID. https://sid.ir/paper/217562/en
Vancouver:
CopyHASANI ALIAKBAR. Multi-Objective Hybrid Metaheuristic Search Algorithm for Distributed Reentrant Permutation Flow Shop Scheduling Via Considering Preventive Maintenance under Uncertainty. PRODUCTION AND OPERATIONS MANAGEMENT[Internet]. 2019;9(2 (17) ):1-22. Available from: https://sid.ir/paper/217562/en
IEEE:
CopyALIAKBAR HASANI, “Multi-Objective Hybrid Metaheuristic Search Algorithm for Distributed Reentrant Permutation Flow Shop Scheduling Via Considering Preventive Maintenance under Uncertainty,” PRODUCTION AND OPERATIONS MANAGEMENT, vol. 9, no. 2 (17) , pp. 1–22, 2019, [Online]. Available: https://sid.ir/paper/217562/en