Information Journal Paper
APA:
CopyDANESHPAYEH, HAMZEH, HASSAN POUR, HOSSEIN ALI, & AMIRKHAN, MOHAMAD. (2014). PROJECT SCHEDULING WITH FUZZY NUMBER USING SIMULATED ANNEALING ALGORITHM. PRODUCTION AND OPERATIONS MANAGEMENT, 5(2 (9)), 57-73. SID. https://sid.ir/paper/217574/en
Vancouver:
CopyDANESHPAYEH HAMZEH, HASSAN POUR HOSSEIN ALI, AMIRKHAN MOHAMAD. PROJECT SCHEDULING WITH FUZZY NUMBER USING SIMULATED ANNEALING ALGORITHM. PRODUCTION AND OPERATIONS MANAGEMENT[Internet]. 2014;5(2 (9)):57-73. Available from: https://sid.ir/paper/217574/en
IEEE:
CopyHAMZEH DANESHPAYEH, HOSSEIN ALI HASSAN POUR, and MOHAMAD AMIRKHAN, “PROJECT SCHEDULING WITH FUZZY NUMBER USING SIMULATED ANNEALING ALGORITHM,” PRODUCTION AND OPERATIONS MANAGEMENT, vol. 5, no. 2 (9), pp. 57–73, 2014, [Online]. Available: https://sid.ir/paper/217574/en