مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

2,254
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

PROJECT SCHEDULING WITH FUZZY NUMBER USING SIMULATED ANNEALING ALGORITHM

Pages

  57-73

Abstract

 This research studies RESOURCE CONSTRAINED PROJECT SCHEDULING problem in a part of a refinery construction project in real world. In real world, most of the activities are new and we have problems such as activity duration uncertainty. This problem causes a change in a project makespan. The RCPSP is NP-hard. Hence, we proposed an optimization method based on SIMULATED ANNEALING to solve the RCPS Problem. In this paper, Fuzzy sets theory is used to represent this activity duration uncertainty. Used schedule generation scheme, in the proposed SIMULATED ANNEALING algorithm, is a fuzzy parallel scheduling generation method. Proposed algorithm generates the minimum project makespan while considers renewable resource-constrained and activity precedence and also has ability to perform with fuzzy numbers for presenting project details such as start and final time of activities and project whole time with fuzzy numbers. Finally, the results of the algorithm will be evaluated and it will be represented that the proposed algorithm is very efficient and can be used by managers and scheduling programmers in real projects.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    DANESHPAYEH, HAMZEH, HASSAN POUR, HOSSEIN ALI, & AMIRKHAN, MOHAMAD. (2014). PROJECT SCHEDULING WITH FUZZY NUMBER USING SIMULATED ANNEALING ALGORITHM. PRODUCTION AND OPERATIONS MANAGEMENT, 5(2 (9)), 57-73. SID. https://sid.ir/paper/217574/en

    Vancouver: Copy

    DANESHPAYEH HAMZEH, HASSAN POUR HOSSEIN ALI, AMIRKHAN MOHAMAD. PROJECT SCHEDULING WITH FUZZY NUMBER USING SIMULATED ANNEALING ALGORITHM. PRODUCTION AND OPERATIONS MANAGEMENT[Internet]. 2014;5(2 (9)):57-73. Available from: https://sid.ir/paper/217574/en

    IEEE: Copy

    HAMZEH DANESHPAYEH, HOSSEIN ALI HASSAN POUR, and MOHAMAD AMIRKHAN, “PROJECT SCHEDULING WITH FUZZY NUMBER USING SIMULATED ANNEALING ALGORITHM,” PRODUCTION AND OPERATIONS MANAGEMENT, vol. 5, no. 2 (9), pp. 57–73, 2014, [Online]. Available: https://sid.ir/paper/217574/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button