Information Journal Paper
APA:
CopyBAHRAMLOO, R., ABBASI, N., GHADAMI FIROUZABADI, A., MAMANPOUSH, A.R., MOUSAVI FAZL, S.H., & SALAMATI, N.. (2017). EFFECT OF EXECUTION AND OPERATION ISSUES ON THE EFFICIENCY OF GEOMEMBRANE LINING IN CONTROL OF WATER SEEPAGE: A (CASE STUDY IN ALBORZ, ISFAHAN, KHUZESTAN, SEMNAN AND HAMEDAN PROVINCES). IRRIGATION AND DRAINAGE STRUCTURES ENGINEERING RESEARCH , 18(69 ), 123-134. SID. https://sid.ir/paper/261347/en
Vancouver:
CopyBAHRAMLOO R., ABBASI N., GHADAMI FIROUZABADI A., MAMANPOUSH A.R., MOUSAVI FAZL S.H., SALAMATI N.. EFFECT OF EXECUTION AND OPERATION ISSUES ON THE EFFICIENCY OF GEOMEMBRANE LINING IN CONTROL OF WATER SEEPAGE: A (CASE STUDY IN ALBORZ, ISFAHAN, KHUZESTAN, SEMNAN AND HAMEDAN PROVINCES). IRRIGATION AND DRAINAGE STRUCTURES ENGINEERING RESEARCH [Internet]. 2017;18(69 ):123-134. Available from: https://sid.ir/paper/261347/en
IEEE:
CopyR. BAHRAMLOO, N. ABBASI, A. GHADAMI FIROUZABADI, A.R. MAMANPOUSH, S.H. MOUSAVI FAZL, and N. SALAMATI, “EFFECT OF EXECUTION AND OPERATION ISSUES ON THE EFFICIENCY OF GEOMEMBRANE LINING IN CONTROL OF WATER SEEPAGE: A (CASE STUDY IN ALBORZ, ISFAHAN, KHUZESTAN, SEMNAN AND HAMEDAN PROVINCES),” IRRIGATION AND DRAINAGE STRUCTURES ENGINEERING RESEARCH , vol. 18, no. 69 , pp. 123–134, 2017, [Online]. Available: https://sid.ir/paper/261347/en