مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

4,373
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

1

Information Journal Paper

Title

Environmental Impact Assessment of Steel Plant Construction

Pages

  49-57

Abstract

 Today, steel production and consumption is applied as an important criterion for measuring the degree of countries industrial development. Needing to investment in construction and economic infrastructure in developing countries, their steel production policy is in the direction of producing the various types of structural steel. In this regard, the main object of the studied Steel Plant construction is creating jobs in the region, reducing imports and contributing to the country's economic development through carbon ingot production with electric arc furnace technology. After assigning the direct study area of the project, the major contaminants arising from the project implementation were investigated in construction and implementation phases and the corrective actions considered to reduce the contaminants effects. In this research, Rapid Assessment method was used for Environmental Impact Assesment that according to the results, among 96 detected impacts, 55. 1 percent of the impacts are negative and 44. 9 percent are positive that in case of observing the corrective actions before and after the project implementation, its negative impacts will be minimized. Also, it is recommended that after the plant costruction, apply a periodic monitoring of the outlet contaminants every three months.

Cites

References

  • No record.
  • Cite

    APA: Copy

    Mirbolooki, Hanieh, ABEDINZADEH, NILOOFAR, & GHANBARI, FATEMEH. (2018). Environmental Impact Assessment of Steel Plant Construction. JOURNAL OF ENVIRONMENTAL RESEARCH AND TECHNOLOGY, 3(4 ), 49-57. SID. https://sid.ir/paper/267644/en

    Vancouver: Copy

    Mirbolooki Hanieh, ABEDINZADEH NILOOFAR, GHANBARI FATEMEH. Environmental Impact Assessment of Steel Plant Construction. JOURNAL OF ENVIRONMENTAL RESEARCH AND TECHNOLOGY[Internet]. 2018;3(4 ):49-57. Available from: https://sid.ir/paper/267644/en

    IEEE: Copy

    Hanieh Mirbolooki, NILOOFAR ABEDINZADEH, and FATEMEH GHANBARI, “Environmental Impact Assessment of Steel Plant Construction,” JOURNAL OF ENVIRONMENTAL RESEARCH AND TECHNOLOGY, vol. 3, no. 4 , pp. 49–57, 2018, [Online]. Available: https://sid.ir/paper/267644/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button