Information Journal Paper
APA:
CopyBOSSAGHZADEH, I., HEJAZI, S.R., & PIRMORADI, Z.. (2015). DEVELOPING ROBUST PROJECT SCHEDULING METHODS FOR UNCERTAIN PARAMETERS. AMIRKABIR INTERNATIONAL JOURNAL OF MODELING, IDENTIFICATION, SIMULATION AND CONTROL, 47(1), 21-32. SID. https://sid.ir/paper/320033/en
Vancouver:
CopyBOSSAGHZADEH I., HEJAZI S.R., PIRMORADI Z.. DEVELOPING ROBUST PROJECT SCHEDULING METHODS FOR UNCERTAIN PARAMETERS. AMIRKABIR INTERNATIONAL JOURNAL OF MODELING, IDENTIFICATION, SIMULATION AND CONTROL[Internet]. 2015;47(1):21-32. Available from: https://sid.ir/paper/320033/en
IEEE:
CopyI. BOSSAGHZADEH, S.R. HEJAZI, and Z. PIRMORADI, “DEVELOPING ROBUST PROJECT SCHEDULING METHODS FOR UNCERTAIN PARAMETERS,” AMIRKABIR INTERNATIONAL JOURNAL OF MODELING, IDENTIFICATION, SIMULATION AND CONTROL, vol. 47, no. 1, pp. 21–32, 2015, [Online]. Available: https://sid.ir/paper/320033/en