Information Journal Paper
APA:
CopyCSEBFALVI, A.. (2012). A THEORETICALLY CORRECT RESOURCE USAGE VISUALIZATION FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM. INTERNATIONAL JOURNAL OF OPTIMIZATION IN CIVIL ENGINEERING, 2(2), 173-181. SID. https://sid.ir/paper/329355/en
Vancouver:
CopyCSEBFALVI A.. A THEORETICALLY CORRECT RESOURCE USAGE VISUALIZATION FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM. INTERNATIONAL JOURNAL OF OPTIMIZATION IN CIVIL ENGINEERING[Internet]. 2012;2(2):173-181. Available from: https://sid.ir/paper/329355/en
IEEE:
CopyA. CSEBFALVI, “A THEORETICALLY CORRECT RESOURCE USAGE VISUALIZATION FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM,” INTERNATIONAL JOURNAL OF OPTIMIZATION IN CIVIL ENGINEERING, vol. 2, no. 2, pp. 173–181, 2012, [Online]. Available: https://sid.ir/paper/329355/en