Information Journal Paper
APA:
CopyCSEBFALVI, A.. (2012). A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS. INTERNATIONAL JOURNAL OF OPTIMIZATION IN CIVIL ENGINEERING, 2(3), 341-355. SID. https://sid.ir/paper/329373/en
Vancouver:
CopyCSEBFALVI A.. A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS. INTERNATIONAL JOURNAL OF OPTIMIZATION IN CIVIL ENGINEERING[Internet]. 2012;2(3):341-355. Available from: https://sid.ir/paper/329373/en
IEEE:
CopyA. CSEBFALVI, “A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS,” INTERNATIONAL JOURNAL OF OPTIMIZATION IN CIVIL ENGINEERING, vol. 2, no. 3, pp. 341–355, 2012, [Online]. Available: https://sid.ir/paper/329373/en