مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

356
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

150
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS

Pages

  341-355

Abstract

 In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained PROJECT SCHEDULING problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any HEURISTIC ALGORITHM developed to solve RCPSP with deterministic activity durations. The essence and viability of our unified model are illustrated by fuzzy examples presented in the recent fuzzy RCPSP literature.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    CSEBFALVI, A.. (2012). A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS. INTERNATIONAL JOURNAL OF OPTIMIZATION IN CIVIL ENGINEERING, 2(3), 341-355. SID. https://sid.ir/paper/329373/en

    Vancouver: Copy

    CSEBFALVI A.. A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS. INTERNATIONAL JOURNAL OF OPTIMIZATION IN CIVIL ENGINEERING[Internet]. 2012;2(3):341-355. Available from: https://sid.ir/paper/329373/en

    IEEE: Copy

    A. CSEBFALVI, “A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS,” INTERNATIONAL JOURNAL OF OPTIMIZATION IN CIVIL ENGINEERING, vol. 2, no. 3, pp. 341–355, 2012, [Online]. Available: https://sid.ir/paper/329373/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button