Information Journal Paper
APA:
CopyKHANZADI, M., DABIRIAN, S., & ZIA GHAZVINI, K.. (2013). DEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY. INTERNATIONAL JOURNAL OF OPTIMIZATION IN CIVIL ENGINEERING, 3(4), 601-616. SID. https://sid.ir/paper/329434/en
Vancouver:
CopyKHANZADI M., DABIRIAN S., ZIA GHAZVINI K.. DEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY. INTERNATIONAL JOURNAL OF OPTIMIZATION IN CIVIL ENGINEERING[Internet]. 2013;3(4):601-616. Available from: https://sid.ir/paper/329434/en
IEEE:
CopyM. KHANZADI, S. DABIRIAN, and K. ZIA GHAZVINI, “DEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY,” INTERNATIONAL JOURNAL OF OPTIMIZATION IN CIVIL ENGINEERING, vol. 3, no. 4, pp. 601–616, 2013, [Online]. Available: https://sid.ir/paper/329434/en