مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

535
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Evaluation of the Possibility of Human Error in the Operation of Tower Cranes Using Success Likelihood Index

Pages

  54-61

Abstract

 Background and Objective: Human error is the most common cause of accidents involving operating cranes in the Construction industry. Operator errors are caused by various factors during crane Loading Operations. Success Likelihood Index Model (SLIM) is used as a simple and effective way to assess the probability of human error. Materials and Methods: In this study, the SLIM method was used to evaluate and manage the possibility of human error in Loading Operations by Tower Cranes. After forming the expert team, the factors influencing the errors in the operation of the cranes were identified in this study. Subsequently, the rate and weight of these factors were determined, and the probability of human error was calculated for each error using the total SLI. Results: Initially, six effective Performance Shaping Factors (PSF) influencing the operation of the Tower Cranes were determined by experts. Out of the identified PSFs, training obtained the greatest impact on the likelihood of human error. By calculating the probability of human error based on the calculated SLIs, it was found that the errors of obstacle collisions (1. 70×10-02 ), contact with power lines (1. 69×10-02 ), and overturns (1. 62×10-02 ) obtained the highest Human Error Probability in descending order. Conclusion: The results of this study showed that the highest probability of human error in crane Loading Operations is related to obstacle collisions. Moreover, the most effective PSFs in creating errors are training, conditions, tools, and experience. Therefore, the reliability and overall safety of the Loading Operations can be increased by planning and holding continuous training courses, updating instructions, and appointing highly experienced people as crane operators.

Cites

  • No record.
  • References

    Cite

    APA: Copy

    MIRZAEI ALIABADI, MOSTAFA, & Khorshidikia, Samane. (2020). Evaluation of the Possibility of Human Error in the Operation of Tower Cranes Using Success Likelihood Index. JOURNAL OF OCCUPATIONAL HYGIENE ENGINEERING, 7(2 ), 54-61. SID. https://sid.ir/paper/384699/en

    Vancouver: Copy

    MIRZAEI ALIABADI MOSTAFA, Khorshidikia Samane. Evaluation of the Possibility of Human Error in the Operation of Tower Cranes Using Success Likelihood Index. JOURNAL OF OCCUPATIONAL HYGIENE ENGINEERING[Internet]. 2020;7(2 ):54-61. Available from: https://sid.ir/paper/384699/en

    IEEE: Copy

    MOSTAFA MIRZAEI ALIABADI, and Samane Khorshidikia, “Evaluation of the Possibility of Human Error in the Operation of Tower Cranes Using Success Likelihood Index,” JOURNAL OF OCCUPATIONAL HYGIENE ENGINEERING, vol. 7, no. 2 , pp. 54–61, 2020, [Online]. Available: https://sid.ir/paper/384699/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top