مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,965
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

ECONOMIC ANALYSIS AND COMPARISON OF FLOOD CONTROL PROJECTS DURING THE CONSTRUCTION OF DIVERSION DAMS: A CASE STUDY

Pages

  15-30

Abstract

 Floods have caused extensive damages in the floodplain every year. An important issue in regions with construction sites of diversion dams is how to protect the project during the construction. In implementating FLOOD MANAGEMENT schemes, both non-structural and structural FLOOD CONTROL options should be considered. The experiences show that nonstructural options are more effective than structural methods in reducing the damages of flood at a lower cost. In this paper, an algorithm is developed to define the best management scheme for flood protection. An ECONOMIC ANALYSIS is undertaken which combines the analysis of probable floods and expected damages for different FLOOD CONTROL options as well as a FLOOD WARNING SYSTEM. The case study is Shirgovaz diversion dam which is located 44 kilometers downstream of the Pishin Dam in South Baloochestan in southeast of Iran. The results show that considering a FLOOD WARNING SYSTEM for the Pishin Dam is an effective method to reduce the flood damages. This system could provide early warning to the Pishin Dam and the rest of the area. A simple FLOOD WARNING SYSTEM has been designed and could utilize the information obtained from upstream synoptic and hydrometric stations. This study shows the significant value of planning FLOOD CONTROL schemes for flood damage reduction.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    KARAMOUZ, M., POURTOISERKANI, A., & AHMADI, A.. (2006). ECONOMIC ANALYSIS AND COMPARISON OF FLOOD CONTROL PROJECTS DURING THE CONSTRUCTION OF DIVERSION DAMS: A CASE STUDY. IRAN-WATER RESOURCES RESEARCH, 2(2), 15-30. SID. https://sid.ir/paper/385958/en

    Vancouver: Copy

    KARAMOUZ M., POURTOISERKANI A., AHMADI A.. ECONOMIC ANALYSIS AND COMPARISON OF FLOOD CONTROL PROJECTS DURING THE CONSTRUCTION OF DIVERSION DAMS: A CASE STUDY. IRAN-WATER RESOURCES RESEARCH[Internet]. 2006;2(2):15-30. Available from: https://sid.ir/paper/385958/en

    IEEE: Copy

    M. KARAMOUZ, A. POURTOISERKANI, and A. AHMADI, “ECONOMIC ANALYSIS AND COMPARISON OF FLOOD CONTROL PROJECTS DURING THE CONSTRUCTION OF DIVERSION DAMS: A CASE STUDY,” IRAN-WATER RESOURCES RESEARCH, vol. 2, no. 2, pp. 15–30, 2006, [Online]. Available: https://sid.ir/paper/385958/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top