مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

300
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Deterministic analysis of emergency AC power recovery during SB-LOCA along with LOOP accident in Bushehr nuclear power plant

Pages

  122-131

Abstract

 The availability of current AC electrical power is essential for the safe operation and accident recovery of commercial nuclear power plants. Loss of offsite power (LOOP) considers as one of the significant post-Fukushima accidents. When the onsite diesel generators are not recovered in the power plant, the accident encounters with station blackout (SBO) situation. In this study, the emergency AC power recovery is investigated during SB-LOCA along with LOOP accident for 25 mm, 50 mm, and 100 mm breaks with RELAP5 thermal-hydronic. Likewise, in evaluating the emergency power recovery scenario, the power plant's recovery in the first and second hours has been investigated. The results showed that in the first hour of emergency power recovery, the reactor is not reached the core damage threshold in all three breaks. Meanwhile, in the second hour of emergency power recovery for 25 mm and 50 mm, the reactor core reaches to core damage threshold before the emergency diesel generators are activated. Therefore, the results show that in SB-LOCAs with a lack of emergency power recovery, there is a chance to recover emergency power and safety systems at least until the first hour.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    HOSSEINI, S.A., & SHIRANI, A.S.. (2021). Deterministic analysis of emergency AC power recovery during SB-LOCA along with LOOP accident in Bushehr nuclear power plant. JOURNAL OF NUCLEAR SCIENCE AND TECHNOLOGY, 42(2 (96) ), 122-131. SID. https://sid.ir/paper/398796/en

    Vancouver: Copy

    HOSSEINI S.A., SHIRANI A.S.. Deterministic analysis of emergency AC power recovery during SB-LOCA along with LOOP accident in Bushehr nuclear power plant. JOURNAL OF NUCLEAR SCIENCE AND TECHNOLOGY[Internet]. 2021;42(2 (96) ):122-131. Available from: https://sid.ir/paper/398796/en

    IEEE: Copy

    S.A. HOSSEINI, and A.S. SHIRANI, “Deterministic analysis of emergency AC power recovery during SB-LOCA along with LOOP accident in Bushehr nuclear power plant,” JOURNAL OF NUCLEAR SCIENCE AND TECHNOLOGY, vol. 42, no. 2 (96) , pp. 122–131, 2021, [Online]. Available: https://sid.ir/paper/398796/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button