مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

315
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

An Approach Based on Earned Value Method to Solve the Problem of Minimizing the Total Costs of Earliness and Tardiness in Research and Development Projects

Pages

  17-29

Abstract

 The costs of earliness and tardiness are considered as the major challenge of Research and development projects. These projects need a more effective method for scheduling and control. Such methods help executives to properly detect the deviations of strategic projects from performance baseline and to adopt appropriate decisions about project activities. In this regard, the Earned Value Method (EVM) can be applied effectively. In this study, a scheduling algorithm is introduced to have high efficiency in minimizing the total earliness and tardiness costs. Practitioners can precisely predict the total time and cost of the project and also adopt appropriate decisions to prevent strategic projects from further financial losses using this technique. The execution of the proposed approach in real cases revealed that it lessens the total costs of earliness and tardiness. Furthermore, the efficiency of the proposed technique in solving the problem was compared to scheduling algorithms in previous studies. In this regard, the TTR index was used that represents the total earliness and tardiness time divided by the project time. The results showed that the proposed algorithm has higher efficiency in minimizing the total costs of earliness and tardiness in Research and development projects.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    Azimzade, Mehdi, KHADEMI ZARE, HASSAN, & Ershadi, Mahmoud. (2019). An Approach Based on Earned Value Method to Solve the Problem of Minimizing the Total Costs of Earliness and Tardiness in Research and Development Projects. JOURNAL OF INDUSTRIAL TECHNOLOGY DEVELOPMENT, 17(36 ), 17-29. SID. https://sid.ir/paper/399785/en

    Vancouver: Copy

    Azimzade Mehdi, KHADEMI ZARE HASSAN, Ershadi Mahmoud. An Approach Based on Earned Value Method to Solve the Problem of Minimizing the Total Costs of Earliness and Tardiness in Research and Development Projects. JOURNAL OF INDUSTRIAL TECHNOLOGY DEVELOPMENT[Internet]. 2019;17(36 ):17-29. Available from: https://sid.ir/paper/399785/en

    IEEE: Copy

    Mehdi Azimzade, HASSAN KHADEMI ZARE, and Mahmoud Ershadi, “An Approach Based on Earned Value Method to Solve the Problem of Minimizing the Total Costs of Earliness and Tardiness in Research and Development Projects,” JOURNAL OF INDUSTRIAL TECHNOLOGY DEVELOPMENT, vol. 17, no. 36 , pp. 17–29, 2019, [Online]. Available: https://sid.ir/paper/399785/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button