CopyHatefi, Seyed Morteza, & MOHSENI, HASSAN. (2020). Evaluating and prioritizing the risks of BOT projects using structural equations and integrated model of fuzzy AHP and fuzzy TOPSIS. JOURNAL OF STRUCTURAL AND CONSTRUCTION ENGINEERING, 6(4 (29) ), 111-130. SID. https://sid.ir/paper/405894/en
Vancouver:
CopyHatefi Seyed Morteza, MOHSENI HASSAN. Evaluating and prioritizing the risks of BOT projects using structural equations and integrated model of fuzzy AHP and fuzzy TOPSIS. JOURNAL OF STRUCTURAL AND CONSTRUCTION ENGINEERING[Internet]. 2020;6(4 (29) ):111-130. Available from: https://sid.ir/paper/405894/en
IEEE:
CopySeyed Morteza Hatefi, and HASSAN MOHSENI, “Evaluating and prioritizing the risks of BOT projects using structural equations and integrated model of fuzzy AHP and fuzzy TOPSIS,” JOURNAL OF STRUCTURAL AND CONSTRUCTION ENGINEERING, vol. 6, no. 4 (29) , pp. 111–130, 2020, [Online]. Available: https://sid.ir/paper/405894/en