مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Journal Paper

Paper Information

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

270
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Providing a multi-objective production scheduling model taking into account preemptive work, early costs, late payment, WIP and downtime penalties with a reliability approach

Pages

  189-202

Abstract

 The subject of the present study is production scheduling taking into consideration the payment of penalties. The purpose of production scheduling is to allocate limited resources over time to perform a group of activities. Therefore, the aim of the research was to develop an appropriate schedule in a production system that deals with issues such as various interruptions in production, lack of forecasting of raw materials required and time required for production, inability to decide on the composition of production which will lead to damages caused by delay and work stoppage. If the work is completed after the delivery date, there will be a penalty for late payment due to customer dissatisfaction, a contractual penalty or loss of credit. Reliability engineering must ensure that components and subsystems meet the defined requirements over a period of time. The research design was based on solving standard sample problems. In this regard, this research provided a mathematical model for multiple purpose scheduling. The scheduling problem was solved in the form of a Reliability problem. Findings showed that solving the problem of production scheduling in the form of Reliability performed well in terms of finding optimal solutions. The Reliability of the system was also confirmed in 14 sample problems.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    Azizi, Alireza, MOVAHEDI, MOHAMMAD MEHDI, & Shayannia, Seyed Ahmad. (2021). Providing a multi-objective production scheduling model taking into account preemptive work, early costs, late payment, WIP and downtime penalties with a reliability approach. KARAFAN, 18(1 ), 189-202. SID. https://sid.ir/paper/407712/en

    Vancouver: Copy

    Azizi Alireza, MOVAHEDI MOHAMMAD MEHDI, Shayannia Seyed Ahmad. Providing a multi-objective production scheduling model taking into account preemptive work, early costs, late payment, WIP and downtime penalties with a reliability approach. KARAFAN[Internet]. 2021;18(1 ):189-202. Available from: https://sid.ir/paper/407712/en

    IEEE: Copy

    Alireza Azizi, MOHAMMAD MEHDI MOVAHEDI, and Seyed Ahmad Shayannia, “Providing a multi-objective production scheduling model taking into account preemptive work, early costs, late payment, WIP and downtime penalties with a reliability approach,” KARAFAN, vol. 18, no. 1 , pp. 189–202, 2021, [Online]. Available: https://sid.ir/paper/407712/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button