مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

260
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Determination Optimal Service Level on BOT Transport Project Contract Based on Zhang Model

Pages

  107-131

Keywords

Not Registered.

Abstract

 In many of developed and developing countries, nowadays, B. O. T conctract is a way in which government performe their essential project as transport one through observing investment from privait firms, instead these privit firms earn the main investment as well as their profit from user fees. For many BOT transport projects, the government imposes service level requirement on the private firm so that project capacity and stochastic demand can be better matched. Service level can be defined as the probability of project capacity satisfying uncertain demand. Due to high risck of this kind of contaracts, the governmet, for many B. O. T transport projects, imposes service level requirement on the private firm so that project capacity and stochastic demand can be better matched. Service level is defined as the probability of project capacity satisfying uncertain demand. In this research as a determination optimal service level on B. O. T transport project contract based on Zhang model (Case Study: Tehran Fleet Electronic Ticket Contract) is conducted. The results suggest that the presence of service level requirement improves B. O. T h user fee and project capacity while decreases firm profit. Moreover, two formulas, to predict the servive level based on ontherrequlations, have been generated from the data of the project, using Gene EXperssion Programming through MATAL. The correlation coefficients of proposed relationship were relatively high, indicating the dependence of service level to project capacity, user fee, privit firm’ s prfite, the number of users, demand uncertainty.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    kiyan, mohammad, HAJIKARIMI, BABAK, & MOZAFARI, MOHAMMAD MAHDI. (2021). Determination Optimal Service Level on BOT Transport Project Contract Based on Zhang Model. JOURNAL OF FINANCIAL ECONOMICS (FINANCIAL ECONOMICS AND DEVELOPMENT), 15(55 ), 107-131. SID. https://sid.ir/paper/412142/en

    Vancouver: Copy

    kiyan mohammad, HAJIKARIMI BABAK, MOZAFARI MOHAMMAD MAHDI. Determination Optimal Service Level on BOT Transport Project Contract Based on Zhang Model. JOURNAL OF FINANCIAL ECONOMICS (FINANCIAL ECONOMICS AND DEVELOPMENT)[Internet]. 2021;15(55 ):107-131. Available from: https://sid.ir/paper/412142/en

    IEEE: Copy

    mohammad kiyan, BABAK HAJIKARIMI, and MOHAMMAD MAHDI MOZAFARI, “Determination Optimal Service Level on BOT Transport Project Contract Based on Zhang Model,” JOURNAL OF FINANCIAL ECONOMICS (FINANCIAL ECONOMICS AND DEVELOPMENT), vol. 15, no. 55 , pp. 107–131, 2021, [Online]. Available: https://sid.ir/paper/412142/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button