Information Journal Paper
APA:
CopyCHRISTODOULOU, S., ELLINAS, G., & POOYAN, A.. (2009). ENTROPY-BASED SCHEDULING OF RESOURCE-CONSTRAINED CONSTRUCTION PROJECTS. AUTOMATION IN CONSTRUCTION, 18(-), 919-928. SID. https://sid.ir/paper/646599/en
Vancouver:
CopyCHRISTODOULOU S., ELLINAS G., POOYAN A.. ENTROPY-BASED SCHEDULING OF RESOURCE-CONSTRAINED CONSTRUCTION PROJECTS. AUTOMATION IN CONSTRUCTION[Internet]. 2009;18(-):919-928. Available from: https://sid.ir/paper/646599/en
IEEE:
CopyS. CHRISTODOULOU, G. ELLINAS, and A. POOYAN, “ENTROPY-BASED SCHEDULING OF RESOURCE-CONSTRAINED CONSTRUCTION PROJECTS,” AUTOMATION IN CONSTRUCTION, vol. 18, no. -, pp. 919–928, 2009, [Online]. Available: https://sid.ir/paper/646599/en