مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

2,867
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

ASSESSMENT AND RANKING OF RISKS IN TUNNELING PROJECTS USING LINEAR ASSIGNMENT TECHNIQUE

Pages

  27-38

Abstract

 Ranking of a project's risks is considered an essential part of risk management process, especially when the number of risk factors increases. In the present study, a comprehensive structure of main risks existing in TUNNELING projects was initially prepared composed of 17 major levels and 196 sub-level, and these risks were subsequently ranked in TUNNELING project of Seymareh dam in South-West of Iran. To this end, group decision making method and weighted average were used for collection and aggregation of experts' judgment, respectively. In addition, LINEAR ASSIGNMENT technique as one of decision making methods was employed in order to determine ranking of risks. Criteria for ranking were classified in two groups, namely primary and secondary classes. The primary index has been determined based upon probability and impact of risks on project goals (including: time, cost, quality and efficiency) with different weights. The second group of criteria included socio- economic impacts, environmental effects, risk proximity, risk exposure, relative uncertainty level and risk manageability. Taking advantage of LINEAR ASSIGNMENT method, risks are better evaluated considering different criteria, and they are therefore ranked more realistically. It was concluded that the economical factors and regularity condition are the project most and least critical risks, respectively.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    SAYADI, A.R., HAYATI, M., & AZAR, A.. (2011). ASSESSMENT AND RANKING OF RISKS IN TUNNELING PROJECTS USING LINEAR ASSIGNMENT TECHNIQUE. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), 22(1), 27-38. SID. https://sid.ir/paper/65362/en

    Vancouver: Copy

    SAYADI A.R., HAYATI M., AZAR A.. ASSESSMENT AND RANKING OF RISKS IN TUNNELING PROJECTS USING LINEAR ASSIGNMENT TECHNIQUE. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN)[Internet]. 2011;22(1):27-38. Available from: https://sid.ir/paper/65362/en

    IEEE: Copy

    A.R. SAYADI, M. HAYATI, and A. AZAR, “ASSESSMENT AND RANKING OF RISKS IN TUNNELING PROJECTS USING LINEAR ASSIGNMENT TECHNIQUE,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), vol. 22, no. 1, pp. 27–38, 2011, [Online]. Available: https://sid.ir/paper/65362/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button