Information Journal Paper
APA:
CopyTAGHADOSI, S., & KHOUSHALHAN, F.. (2010). A REVIEW OF MULTIPLE OBJECTIVE FLOWSHOP SCHEDULING PROBLEMS. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), 21(3), 13-22. SID. https://sid.ir/paper/65532/en
Vancouver:
CopyTAGHADOSI S., KHOUSHALHAN F.. A REVIEW OF MULTIPLE OBJECTIVE FLOWSHOP SCHEDULING PROBLEMS. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN)[Internet]. 2010;21(3):13-22. Available from: https://sid.ir/paper/65532/en
IEEE:
CopyS. TAGHADOSI, and F. KHOUSHALHAN, “A REVIEW OF MULTIPLE OBJECTIVE FLOWSHOP SCHEDULING PROBLEMS,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), vol. 21, no. 3, pp. 13–22, 2010, [Online]. Available: https://sid.ir/paper/65532/en