Information Journal Paper
APA:
CopyTAVAKOLI MOGHADAM, R., & SAFAEI, N.. (2007). A NEURAL APPROACH FOR CONSTRAINT SATISFACTION OF A GENERALIZED JOB SHOP SCHEDULING PROBLEM WITH FUZZY PROCESS TIMES. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), 17(6), 67-77. SID. https://sid.ir/paper/65566/en
Vancouver:
CopyTAVAKOLI MOGHADAM R., SAFAEI N.. A NEURAL APPROACH FOR CONSTRAINT SATISFACTION OF A GENERALIZED JOB SHOP SCHEDULING PROBLEM WITH FUZZY PROCESS TIMES. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN)[Internet]. 2007;17(6):67-77. Available from: https://sid.ir/paper/65566/en
IEEE:
CopyR. TAVAKOLI MOGHADAM, and N. SAFAEI, “A NEURAL APPROACH FOR CONSTRAINT SATISFACTION OF A GENERALIZED JOB SHOP SCHEDULING PROBLEM WITH FUZZY PROCESS TIMES,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), vol. 17, no. 6, pp. 67–77, 2007, [Online]. Available: https://sid.ir/paper/65566/en