Information Journal Paper
APA:
CopyTAVAKOLI MOGHADAM, R., & MIR SHEKARI, A.. (2005). A MULTI-CRITERIA SINGLE MACHINE SCHEDULING PROBLEM INCREASING CUSTOMER SATISFACTION BY A HEURISTIC ALGORITHM. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), 16(3), 33-40. SID. https://sid.ir/paper/65589/en
Vancouver:
CopyTAVAKOLI MOGHADAM R., MIR SHEKARI A.. A MULTI-CRITERIA SINGLE MACHINE SCHEDULING PROBLEM INCREASING CUSTOMER SATISFACTION BY A HEURISTIC ALGORITHM. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN)[Internet]. 2005;16(3):33-40. Available from: https://sid.ir/paper/65589/en
IEEE:
CopyR. TAVAKOLI MOGHADAM, and A. MIR SHEKARI, “A MULTI-CRITERIA SINGLE MACHINE SCHEDULING PROBLEM INCREASING CUSTOMER SATISFACTION BY A HEURISTIC ALGORITHM,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), vol. 16, no. 3, pp. 33–40, 2005, [Online]. Available: https://sid.ir/paper/65589/en