Information Journal Paper
APA:
CopyRABANI, M., TAVAKOLI MOGHADAM, R., & MOHAMMADIPOUR, M.. (2004). DEVELOPING AN EFFICIENT HEURISTIC FOR JOB SHOP SCHEDULING PROBLEM CONSIDERING UNCERTAINTIES. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), 15(1), 27-42. SID. https://sid.ir/paper/65799/en
Vancouver:
CopyRABANI M., TAVAKOLI MOGHADAM R., MOHAMMADIPOUR M.. DEVELOPING AN EFFICIENT HEURISTIC FOR JOB SHOP SCHEDULING PROBLEM CONSIDERING UNCERTAINTIES. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN)[Internet]. 2004;15(1):27-42. Available from: https://sid.ir/paper/65799/en
IEEE:
CopyM. RABANI, R. TAVAKOLI MOGHADAM, and M. MOHAMMADIPOUR, “DEVELOPING AN EFFICIENT HEURISTIC FOR JOB SHOP SCHEDULING PROBLEM CONSIDERING UNCERTAINTIES,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), vol. 15, no. 1, pp. 27–42, 2004, [Online]. Available: https://sid.ir/paper/65799/en