Information Journal Paper
APA:
CopyFATEMI GHOMI, S.M.T., & ASHJARI, B.. (2002). SCHEDULING AND ALLOCATION OF CONSTRAINED RESOURCE FOR PARALLEL PROJECTS. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), 12(4), 193-208. SID. https://sid.ir/paper/66001/en
Vancouver:
CopyFATEMI GHOMI S.M.T., ASHJARI B.. SCHEDULING AND ALLOCATION OF CONSTRAINED RESOURCE FOR PARALLEL PROJECTS. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN)[Internet]. 2002;12(4):193-208. Available from: https://sid.ir/paper/66001/en
IEEE:
CopyS.M.T. FATEMI GHOMI, and B. ASHJARI, “SCHEDULING AND ALLOCATION OF CONSTRAINED RESOURCE FOR PARALLEL PROJECTS,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), vol. 12, no. 4, pp. 193–208, 2002, [Online]. Available: https://sid.ir/paper/66001/en