مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

756
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

SOLVING THE SINGLE MACHINE PROBLEM WITH QUADRATIC EARLINESS AND TARDINESS PENALTIES

Pages

  263-272

Abstract

 Nowadays, SCHEDULING problems have a considerable application in production and service systems. In this paper, we consider the SCHEDULING of n jobs on a SINGLE MACHINE assuming no machine idleness, non-preemptive jobs and equal process times. In many of previous researches, because of the delivery dalays and holding costs, earliness and tardiness penalties emerge in the form of linear combinations in objective functions. However, minimizing the weighted QUADRATIC EARLINESS AND TARDINESS penalties is considered in this paper. A BRANCH AND BOUND algorithm including some dominance rules, lower bounds and upper bounds is proposed to solve the problem. Finally, the efficiency of proposed method is proved via some test problems.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    KIANFAR, KAMRAN, & MOSLEHI, GHASEM. (2011). SOLVING THE SINGLE MACHINE PROBLEM WITH QUADRATIC EARLINESS AND TARDINESS PENALTIES. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), 22(3), 263-272. SID. https://sid.ir/paper/66021/en

    Vancouver: Copy

    KIANFAR KAMRAN, MOSLEHI GHASEM. SOLVING THE SINGLE MACHINE PROBLEM WITH QUADRATIC EARLINESS AND TARDINESS PENALTIES. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN)[Internet]. 2011;22(3):263-272. Available from: https://sid.ir/paper/66021/en

    IEEE: Copy

    KAMRAN KIANFAR, and GHASEM MOSLEHI, “SOLVING THE SINGLE MACHINE PROBLEM WITH QUADRATIC EARLINESS AND TARDINESS PENALTIES,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), vol. 22, no. 3, pp. 263–272, 2011, [Online]. Available: https://sid.ir/paper/66021/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button