Information Journal Paper
APA:
CopyRABANI, M., & MIRALI YARI, S.A.. (2005). BI-OBJECTIVE OPTIMIZATION OF JIT PRODUCTION SYSTEMS IN BATCH MANUFACTURING ENVIRONMENT: MINIMUM WIP COST AND RESOURCE OVERTIME COST. AMIRKABIR, 16(62-B), 17-28. SID. https://sid.ir/paper/751/en
Vancouver:
CopyRABANI M., MIRALI YARI S.A.. BI-OBJECTIVE OPTIMIZATION OF JIT PRODUCTION SYSTEMS IN BATCH MANUFACTURING ENVIRONMENT: MINIMUM WIP COST AND RESOURCE OVERTIME COST. AMIRKABIR[Internet]. 2005;16(62-B):17-28. Available from: https://sid.ir/paper/751/en
IEEE:
CopyM. RABANI, and S.A. MIRALI YARI, “BI-OBJECTIVE OPTIMIZATION OF JIT PRODUCTION SYSTEMS IN BATCH MANUFACTURING ENVIRONMENT: MINIMUM WIP COST AND RESOURCE OVERTIME COST,” AMIRKABIR, vol. 16, no. 62-B, pp. 17–28, 2005, [Online]. Available: https://sid.ir/paper/751/en