Information Journal Paper
APA:
CopyJOULAEI, F., MOATAR HOSSEINI, S.M., & HASAN HOSSEINI, S.M.. (2004). FLOW SHOP SCHEDULING PROBLEM WITH MINIMIZING EARLINESS/TARDINESS CRITERIA. AMIRKABIR, 15(58-D), 452-461. SID. https://sid.ir/paper/844/en
Vancouver:
CopyJOULAEI F., MOATAR HOSSEINI S.M., HASAN HOSSEINI S.M.. FLOW SHOP SCHEDULING PROBLEM WITH MINIMIZING EARLINESS/TARDINESS CRITERIA. AMIRKABIR[Internet]. 2004;15(58-D):452-461. Available from: https://sid.ir/paper/844/en
IEEE:
CopyF. JOULAEI, S.M. MOATAR HOSSEINI, and S.M. HASAN HOSSEINI, “FLOW SHOP SCHEDULING PROBLEM WITH MINIMIZING EARLINESS/TARDINESS CRITERIA,” AMIRKABIR, vol. 15, no. 58-D, pp. 452–461, 2004, [Online]. Available: https://sid.ir/paper/844/en