مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

3,289
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

1

Information Journal Paper

Title

RISK ASSESSMENT IN A SWEETENING UNIT IN AN IRANIAN GAS REFINERY

Pages

  41-50

Abstract

 The risks of process hazards and equipment failures were calculated in a gas refinery -sweetening unit. The process hazards were identified by Hazard and operability study (HAZOP) and the component's failures of major equipments were assessed by FAILURE MODE AND EFFECT ANALYSIS (FMEA). Totally 68 hazards were identified and their risks were calculated. The highest risk (60) was belonged to the reduction of gas temperature before entering to the refinery and failure of DEA cooling system at the final node (DE). The failures of P-6 pump, F.C.VA valve, L.C.V.2 and F.C.V.12 (all in the same node) and reduction of gas temperature in nodes AB, BC and CD had the lowest calculated risk (12). Comparing with the acceptable level of risk in the refinery which was 200, all of the identified hazards risk were very low therefore did not need any appropriate measure of risk reduction to be proposed. For overcoming the fact that both HAZOP and FMEA techniques, instead of being performed by a team was accomplished by both of us, we used the consultations given us by the experienced exploitation engineers of under study unit. This consultation was also very useful in fulfilling deficiencies of existing record keeping system. Performing the protective maintenance and preparing a precise timing program for P.M was given as a main proposal for risk reduction by decreasing the probability of occurrence.    

Cites

References

  • No record.
  • Cite

    APA: Copy

    GHAHRAMANI, A., ADL, JAVAD, & NASL SERAJI, J.. (2005). RISK ASSESSMENT IN A SWEETENING UNIT IN AN IRANIAN GAS REFINERY. JOURNAL OF SCHOOL OF PUBLIC HEALTH AND INSTITUTE OF PUBLIC HEALTH RESEARCH, 3(4 (12)), 41-50. SID. https://sid.ir/paper/85064/en

    Vancouver: Copy

    GHAHRAMANI A., ADL JAVAD, NASL SERAJI J.. RISK ASSESSMENT IN A SWEETENING UNIT IN AN IRANIAN GAS REFINERY. JOURNAL OF SCHOOL OF PUBLIC HEALTH AND INSTITUTE OF PUBLIC HEALTH RESEARCH[Internet]. 2005;3(4 (12)):41-50. Available from: https://sid.ir/paper/85064/en

    IEEE: Copy

    A. GHAHRAMANI, JAVAD ADL, and J. NASL SERAJI, “RISK ASSESSMENT IN A SWEETENING UNIT IN AN IRANIAN GAS REFINERY,” JOURNAL OF SCHOOL OF PUBLIC HEALTH AND INSTITUTE OF PUBLIC HEALTH RESEARCH, vol. 3, no. 4 (12), pp. 41–50, 2005, [Online]. Available: https://sid.ir/paper/85064/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button