مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

131
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

93
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Seminar Paper

Title

DESIGN PARAMETERS FOR THE WAG PROCESS

Author(s)

Shafiei Ali Asghar

Pages

  -

Abstract

 IN RECENT YEARS THERE HAS BEEN AN INCREASING INTEREST IN WAG PROCESSES, BOTH MISCIBLE AND IMMISCIBLE. DESIGN OF WAG PROCESS IS MORE COMPLICATED THAN WATERFLOOD AND GAS INJECTION PROCESSES, DUE TO EXISTENCE OF THREE MOBILE PHASES SIMULATANEOUSLY. PARAMETERS THAT SHOULD BE CONSIDERED FOR THE WAG PROCESS INCLUDE RESERVOIR HETEROGENEITY AND STRATIFICATION, ROCK AND FLUID CHARACTERISTICS, INJECTION GAS CHARACTERISTICS, INJECTION PATTERN, TAPERING (CHANGE IN WATER TO GAS RATIO THROUGHOUT THE FLOOD), WAG INJECTION PARAMETERS (WATER TO GAS RATIO, NUMBER OF CYCLES, INJECTION RATES), FLOW DISPERSION EFFECTS (RELATIVE PERMEABILITY DESCRIPTION FOR THREE PHASES), GRAVITY CONSIDERATIONS IN WAG AND LABORATORY STUDIES AND SIMULATION. PLAIN GAS INJECTION IS A WAG PROCESS WITH WATER TO GAS RATIO OF 0:1, HENCE THESE THESE DESIGN ISSUES ARE APPLICABLE TO GAS INJECTION DESIGN. THE POPULARITY OF THE WAG PROCESS IS EVIDENT FROM THE INCREASING NUMBER OF PROJECTS AND MANY SUCCESSFUL FIELD WIDE APPLICATIONS. WATERFLOODING AND PLAIN GAS INJECTION ARE TWO COMMONLY-USED EOR METHODS IN IRANIAN RESERVOIRS, BUT THEIR ASSOCCIATED PROBLEMS LEAD TO LOWER PRODUCTION LIFE OF THE WELLS. IT'S BEEN APPROVED THAT WAG PROCESS, IN SOME CASES, MODIFIES THE DEMERITS OF THESE PROCESSES, HENCE MORE RESIDUAL OIL IS PRODUCED. AFTER DESIGN OF THE WAG PROCESS PILOT TESTS ARE REQUIRED TO MONITOR ITS PERFORMANCE IN THE FIELD.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    Shafiei, Ali Asghar. (2012). DESIGN PARAMETERS FOR THE WAG PROCESS. NATIONAL CONFERENCE ON HYDROCARBON RESERVOIR ENGINEERING, SCIENCE AND RELATED INDUSTRIES. SID. https://sid.ir/paper/923060/en

    Vancouver: Copy

    Shafiei Ali Asghar. DESIGN PARAMETERS FOR THE WAG PROCESS. 2012. Available from: https://sid.ir/paper/923060/en

    IEEE: Copy

    Ali Asghar Shafiei, “DESIGN PARAMETERS FOR THE WAG PROCESS,” presented at the NATIONAL CONFERENCE ON HYDROCARBON RESERVOIR ENGINEERING, SCIENCE AND RELATED INDUSTRIES. 2012, [Online]. Available: https://sid.ir/paper/923060/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button