مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

455
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Determination of optimum extraction to maximize couping Quarry stone using discontinuity modeling (Case study of Travertine Kapul Mine)

Pages

  15-29

Abstract

 Dimension stone reserves contains intact rock and discontinuity network. The intersection between discontinuities forms rock blocks with various geometry. Determination of rock blocks geometry is required in order to economical evaluation of stone reserves. Beside, extraction of stone blocks are preform by cutting planes, and the optimization of cutting pattern leads to increasing quarrying efficiency and decreasing production of waste in quarries. This procedure result less environmental damages and more economical beneficiations. The operation will reduce environmental impacts and increase economic interests. In this research, first, important features of discontinuities such as persistence, spacing, orientation, etc. have been extracted in the Kipul Quarry stone mine. then, using 3DEC simulation of the block model and using block modeling, different joint azimuth rotation was investigated in four classes. analyzing the results obtained from the modeling showed that in order to obtain maximum value, the current extraction direction must be 70 degrees west, which resulted in an average in situ block of 287. 58cubic meters and the amount of coups sold in four classes 65826. 27 cubic meters, which according to the current rate will generate about 115 billion and 98 million USD for this mine.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    Salehabadi, Hadi, ATAEI, MOHAMMAD, & RAFIEE, RAMIN. (2021). Determination of optimum extraction to maximize couping Quarry stone using discontinuity modeling (Case study of Travertine Kapul Mine). ENGINEERING GEOLOGY, 14(2 ), 15-29. SID. https://sid.ir/paper/956787/en

    Vancouver: Copy

    Salehabadi Hadi, ATAEI MOHAMMAD, RAFIEE RAMIN. Determination of optimum extraction to maximize couping Quarry stone using discontinuity modeling (Case study of Travertine Kapul Mine). ENGINEERING GEOLOGY[Internet]. 2021;14(2 ):15-29. Available from: https://sid.ir/paper/956787/en

    IEEE: Copy

    Hadi Salehabadi, MOHAMMAD ATAEI, and RAMIN RAFIEE, “Determination of optimum extraction to maximize couping Quarry stone using discontinuity modeling (Case study of Travertine Kapul Mine),” ENGINEERING GEOLOGY, vol. 14, no. 2 , pp. 15–29, 2021, [Online]. Available: https://sid.ir/paper/956787/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button