مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,167
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

ESTIMATION OF COST AND THE AMOUNT OF PRODUCTION IN CONSTRUCTION OF FOREST ROAD BY COMBINING HYDRAULIC EXCAVATOR AND BULLDOZER (CASE STUDY: LIASHISERA DISTRICT, GUILAN PROVINCE)

Pages

  320-331

Abstract

 Using machines such as HYDRAULIC EXCAVATOR and BULLDOZER is very common in construction of FOREST ROADs, and their costs have a major share from the hourly cost of a road construction project. Therefore, the estimation of production and costs of each apparatus production unit is regarded as a powerful mean for appropriate management and optimum usage of the facilities. In Liashisera district situated in 27th watershed of Amlash, a combination of two machines of HYDRAULIC EXCAVATOR and BULLDOZER were used in the road construction due to economic and environmental considerations. Majority of excavation operations were initially carried out by HYDRAULIC EXCAVATOR, and the BULLDOZER was used in the final stage to correct the slope and prepare the road bed for pouring sand scattering. The components of daily construction work including useful and useless times, technical and personal delays were assessed by TIME STUDY technique in various slope categories. The results showed the average of production amounts of two machines in the slope classes of 10-30, 30-50 and 50-70 percent to be 71.23, 61.49 and 87.18 m3/h and 13.31, 20.87 and 12.28 m/h, respectively. Production cost of two machines per useful working hour was shown to be 8267 IRR per m3 and 39325 IRR per m.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    HOSSIENPOUR ASLI, K., NAGHDI, R., & NIKOOY, M.. (2015). ESTIMATION OF COST AND THE AMOUNT OF PRODUCTION IN CONSTRUCTION OF FOREST ROAD BY COMBINING HYDRAULIC EXCAVATOR AND BULLDOZER (CASE STUDY: LIASHISERA DISTRICT, GUILAN PROVINCE). IRANIAN JOURNAL OF FOREST AND POPLAR RESEARCH, 23(2), 320-331. SID. https://sid.ir/paper/111096/en

    Vancouver: Copy

    HOSSIENPOUR ASLI K., NAGHDI R., NIKOOY M.. ESTIMATION OF COST AND THE AMOUNT OF PRODUCTION IN CONSTRUCTION OF FOREST ROAD BY COMBINING HYDRAULIC EXCAVATOR AND BULLDOZER (CASE STUDY: LIASHISERA DISTRICT, GUILAN PROVINCE). IRANIAN JOURNAL OF FOREST AND POPLAR RESEARCH[Internet]. 2015;23(2):320-331. Available from: https://sid.ir/paper/111096/en

    IEEE: Copy

    K. HOSSIENPOUR ASLI, R. NAGHDI, and M. NIKOOY, “ESTIMATION OF COST AND THE AMOUNT OF PRODUCTION IN CONSTRUCTION OF FOREST ROAD BY COMBINING HYDRAULIC EXCAVATOR AND BULLDOZER (CASE STUDY: LIASHISERA DISTRICT, GUILAN PROVINCE),” IRANIAN JOURNAL OF FOREST AND POPLAR RESEARCH, vol. 23, no. 2, pp. 320–331, 2015, [Online]. Available: https://sid.ir/paper/111096/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button