مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,081
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

EVALUATION OF WATERSHED MANAGEMENT ON FLOOD FORECAST LEAD TIME IN GOLABDARE-DARBAND BASIN

Pages

  7-14

Abstract

 In recent years, using non-structural methods especially forecasting flood has increased the success of flood control as well as structural methods. The main purpose of this research is to estimate the effect of WATERSHED MANAGEMENT on flood FORECAST LEAD TIME in Golabdare-Darband basin using HEC-HMS model.We defined five scenarios for different land uses, including conditions of 1955, 1988 and 2001, suitable and unsuitable WATERSHED MANAGEMENT. The land use that was used in this paper is similar to the land use of 2001. The HEC-HMS model is calibrated using recorded rainfall and flood hydro graph and it is verified. Floods of different return periods are simulated. The FORECAST LEAD TIME is estimated for five scenarios using the 25-year peak flood (for the scenario of 1988) as a threshold flood warning. The result shows that the lead time increases by decreasing in return periods. The Comparison of FORECAST LEAD TIME between five scenarios shows the FORECAST LEAD TIME is longest for 1988 land use. The FORECAST LEAD TIME of unsuitable management was decreased to 35 percent of the FORECAST LEAD TIME of 1988 scenario. The shortest of FORECAST LEAD TIME was for unsuitable management of the watershed.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    BANIHABIB, M.E., & ARABI, A.. (2009). EVALUATION OF WATERSHED MANAGEMENT ON FLOOD FORECAST LEAD TIME IN GOLABDARE-DARBAND BASIN. IRANIAN JOURNAL OF WATERSHED MANAGEMENT SCIENCE AND ENGINEERING, 3(7), 7-14. SID. https://sid.ir/paper/134670/en

    Vancouver: Copy

    BANIHABIB M.E., ARABI A.. EVALUATION OF WATERSHED MANAGEMENT ON FLOOD FORECAST LEAD TIME IN GOLABDARE-DARBAND BASIN. IRANIAN JOURNAL OF WATERSHED MANAGEMENT SCIENCE AND ENGINEERING[Internet]. 2009;3(7):7-14. Available from: https://sid.ir/paper/134670/en

    IEEE: Copy

    M.E. BANIHABIB, and A. ARABI, “EVALUATION OF WATERSHED MANAGEMENT ON FLOOD FORECAST LEAD TIME IN GOLABDARE-DARBAND BASIN,” IRANIAN JOURNAL OF WATERSHED MANAGEMENT SCIENCE AND ENGINEERING, vol. 3, no. 7, pp. 7–14, 2009, [Online]. Available: https://sid.ir/paper/134670/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button