مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,532
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

2

Information Journal Paper

Title

EFFECT OF CHECK DAMS ON REDUCTION OF FLOOD PEAK (CASE STUDY: MANSHAD WATERSHED)

Pages

  46-54

Abstract

 Watershed management structures are expensive projects that are built with purposes of erosion and sediment reduction and flood control in watersheds. Quantitative assessment of watershed management activities in order to analyze their impacts and making basic decision for implementation of these activities are necessary. As building any structure on bed of dry rivers can effect on river behavior, then, this research was done with aim of investigating the effect of CHECK DAMS on flooding in MANSHAD WATERSHED. Therefore, the HEC-HMS MODEL was used for comparison of discharge variations with/without checkdams construction. To determine the effects of CHECK DAMS, the concentration time (after building the structures) was computed and by changing the input parameters, the flood behavior was simulated. Moreover, model was validated and calibrated by six observed event and flood hydrograph was simulated for return periods of 2 to 100 years before and after the structures operation. To evaluate the effect of checkdams on flooding, the peak discharge and flood volume indices were determined for two conditions (before and after the structures operation).Based on the simulation results, the effect of structures on reduction of peak discharge and flood volume were 9.82 and 7.75%, respectively. On the other hand, by increasing the return period of flood, the structures effects on the reduction of peak discharge and flood volume have been decreased as the rate of variations in return periods of 2 to 100 years have been 14.14 till 6.95.

Cites

References

  • No record.
  • Cite

    APA: Copy

    SOLTANI, MAHBOOBEH, EKHTESASI, MOHAMMAD REZA, TALEBI, ALI, POURAGHNIAEI, MOHAMMAD JAVAD, & SARSANGI, ALI REZA. (2012). EFFECT OF CHECK DAMS ON REDUCTION OF FLOOD PEAK (CASE STUDY: MANSHAD WATERSHED). WATERSHED MANAGEMENT RESEARCHES (PAJOUHESH-VA-SAZANDEGI), 24(4 (93)), 46-54. SID. https://sid.ir/paper/200548/en

    Vancouver: Copy

    SOLTANI MAHBOOBEH, EKHTESASI MOHAMMAD REZA, TALEBI ALI, POURAGHNIAEI MOHAMMAD JAVAD, SARSANGI ALI REZA. EFFECT OF CHECK DAMS ON REDUCTION OF FLOOD PEAK (CASE STUDY: MANSHAD WATERSHED). WATERSHED MANAGEMENT RESEARCHES (PAJOUHESH-VA-SAZANDEGI)[Internet]. 2012;24(4 (93)):46-54. Available from: https://sid.ir/paper/200548/en

    IEEE: Copy

    MAHBOOBEH SOLTANI, MOHAMMAD REZA EKHTESASI, ALI TALEBI, MOHAMMAD JAVAD POURAGHNIAEI, and ALI REZA SARSANGI, “EFFECT OF CHECK DAMS ON REDUCTION OF FLOOD PEAK (CASE STUDY: MANSHAD WATERSHED),” WATERSHED MANAGEMENT RESEARCHES (PAJOUHESH-VA-SAZANDEGI), vol. 24, no. 4 (93), pp. 46–54, 2012, [Online]. Available: https://sid.ir/paper/200548/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button