Information Journal Paper
APA:
CopyNASAJI ZAVAREH, M., & MAHDAVI, M.. (2005). A DETERMINATION OF PEAK- FLOOD USING DIFFERENT CURVE NUMBER METHODS (CASE STUDY, CENTRAL ALBORZ AREA). IRANIAN JOURNAL OF NATURAL RESOURCES, 58(2), 315-324. SID. https://sid.ir/paper/22744/en
Vancouver:
CopyNASAJI ZAVAREH M., MAHDAVI M.. A DETERMINATION OF PEAK- FLOOD USING DIFFERENT CURVE NUMBER METHODS (CASE STUDY, CENTRAL ALBORZ AREA). IRANIAN JOURNAL OF NATURAL RESOURCES[Internet]. 2005;58(2):315-324. Available from: https://sid.ir/paper/22744/en
IEEE:
CopyM. NASAJI ZAVAREH, and M. MAHDAVI, “A DETERMINATION OF PEAK- FLOOD USING DIFFERENT CURVE NUMBER METHODS (CASE STUDY, CENTRAL ALBORZ AREA),” IRANIAN JOURNAL OF NATURAL RESOURCES, vol. 58, no. 2, pp. 315–324, 2005, [Online]. Available: https://sid.ir/paper/22744/en