Search Results/Filters    

Filters

Year

Banks




Expert Group











Full-Text


Author(s): 

BRUCKER P. | KNUST S.

Issue Info: 
  • Year: 

    2001
  • Volume: 

    2079
  • Issue: 

    -
  • Pages: 

    277-293
Measures: 
  • Citations: 

    1
  • Views: 

    165
  • Downloads: 

    0
Keywords: 
Abstract: 

Yearly Impact: مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 165

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesCitation 1 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesRefrence 0
Issue Info: 
  • Year: 

    2018
  • Volume: 

    5
  • Issue: 

    1
  • Pages: 

    39-49
Measures: 
  • Citations: 

    0
  • Views: 

    195
  • Downloads: 

    178
Abstract: 

Despite the dynamic nature of real life SCHEDULING problems, few studies focus on stochastic RESOURCE CONSTRAINED PROJECT SCHEDULING problem and its variants. In this study, we consider stochastic RESOURCE possibilities and propose a new chance constraint, piecewise-linear and mixed integer programming model. Model is tested and verified with known PROJECT instances. One of the main strengths of the proposed model is it can be used to construct baseline schedules with a predetermined confidence interval. This gives scheduler an opportunity to construct proactive actions in order to minimize disruptions.

Yearly Impact: مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 195

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 178 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesCitation 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesRefrence 0
Author(s): 

BAPTISTE P. | DEMASSEY S.

Journal: 

OR SPECTRUM

Issue Info: 
  • Year: 

    2004
  • Volume: 

    26
  • Issue: 

    2
  • Pages: 

    251-262
Measures: 
  • Citations: 

    1
  • Views: 

    119
  • Downloads: 

    0
Keywords: 
Abstract: 

Yearly Impact: مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 119

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesCitation 1 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesRefrence 0
Issue Info: 
  • Year: 

    2016
  • Volume: 

    2
Measures: 
  • Views: 

    162
  • Downloads: 

    74
Abstract: 

THIS PAPER PROVIDES MATHEMATICAL ANALYSIS FOR A RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM IN TWO FOLDS: MATHEMATICAL FORMULATION, AND ALGORITHM DEVELOPMENT. CORRESPONDINGLY, THE PROBLEM HAS SOME SPECIAL ASSUMPTIONS SUCH AS (I) RESOURCES NEED A LAG TIME AFTER EACH USE IN ORDER TO HAVE RECOVERY/SERVICE, (II) EACH ACTIVITY CAN BE COMPRESSED, AND (III) PROJECT AVAILABLE BUDGET IS LIMITED. THIS PROBLEM IS RARELY ANALYZED IN THE LITERATURE ESPECIALLY FOR THE CASE OF DEDICATED RESOURCES, WHILE WE DEVELOP A SPECIAL-PURPOSE ALGORITHM THAT DEFEATS GENERAL-PURPOSE SOLVER LINGO 11.0 ON DIFFERENT TEST PROBLEMS. THE PROPOSED ALGORITHM USES PROBLEM CHARACTERISTICS IN THE FORM OF GUIDING RULES EFFICIENTLY. AT THE END, COMPUTATIONAL EXPERIENCES ARE REPORTED.

Yearly Impact:   مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 162

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 74
Issue Info: 
  • Year: 

    2006
  • Volume: 

    2
  • Issue: 

    1
  • Pages: 

    19-30
Measures: 
  • Citations: 

    0
  • Views: 

    201
  • Downloads: 

    89
Abstract: 

This paper discusses the problem of allocation of CONSTRAINED renewable RESOURCE to splittable activities of a single PROJECT. If the activities of stochastic PROJECTs can be split, these PROJECTs may be completed in shorter time when the available RESOURCE is CONSTRAINED. It is assumed that the RESOURCE amount required to accomplish each activity is a discrete quantity and deterministic. The activity duration time is assumed to be a discrete random variable with arbitrary experimental distribution. Solving stochastic mathematical programming model of problem is very hard. So, here some existing methods for deterministic problems have been generalized for stochastic case. Solutions of generalized methods are relatively better than random solutions. However, the authors developed the new algorithm that may improve the solutions of generalized methods and PROJECT Completion Time Distribution Function (CTDF). Comparison of solution of a method with random solutions is a common assessment method in literature research. Hence, the efficiency of the proposed algorithm represented using this method.

Yearly Impact: مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 201

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 89 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesCitation 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesRefrence 0
Issue Info: 
  • Year: 

    2009
  • Volume: 

    5
Measures: 
  • Views: 

    194
  • Downloads: 

    101
Abstract: 

This study presents a memetic algorithm for the RESOURCE-CONSTRAINED PROJECT SCHEDULING problem (RCPSP) with make span minimization as objective. We propose a new memetic algorithm approach to solve this problem and a serial scheme is utilized to provide a schedule according to the precedence and RESOURCE constraints to be evaluated. Then the framework of the memetic algorithm for the RCPSP is developed. The procedures are as follows. First, ACO searches the solution space and generates activity lists to provide the initial population for memetic. Next, memetic is executed and improves the initial solution. Analyses are provided to investigate the performance of the memetic approach for the RCPSP. The study aims at developing an alternative and efficient optimization methodology for solving the RCPSP and opening the application of meme tic to this problem. The experimental results of this met heuristic on the standard sets of the PROJECT instances show that this is an effective method for solving the RCPSP.

Yearly Impact:   مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 194

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 101
Author(s): 

KAVEH A. | Vazirinia Y.

Journal: 

Scientia Iranica

Issue Info: 
  • Year: 

    2020
  • Volume: 

    27
  • Issue: 

    4 (Transactions A: civil engineering)
  • Pages: 

    1826-1842
Measures: 
  • Citations: 

    0
  • Views: 

    84
  • Downloads: 

    102
Abstract: 

PROJECT SCHEDULING in the RESOURCE-CONSTRAINED situation is one of the key issues of PROJECT-oriented organizations. The aim of RESOURCE-CONSTRAINED PROJECT SCHEDULING Problem (RCPSP) is to nd a schedule with minimum makespan by considering precedence and RESOURCE constraints. RCPSP is a combinatorial optimization problem and belongs to the NP-hard class of problems. The exact methods search the entire search space and are unable to solve a large-sized PROJECT network problem. Thus, metaheuristics are used to solve this problem in a short computational time. Due to the probabilistic nature of metaheuristics, it is a challenging problem to make a balance between exploitation and exploration phases. The literature review shows that embedding of chaos improves both the convergence speed and the local optima avoidance of metaheuristics. This paper presents a Chaotic Vibrating Particles System (CVPS) optimization algorithm for solving the RCPSP. Vibrating Particles System (VPS) is a physics-inspired metaheuristic which mimics the free vibration of single-degree-of-freedom systems with viscous damping. The performance and applicability of the CVPS are compared with the standard VPS and ve well-known algorithms on three benchmark instances of the RCPSPs. Experimental studies reveal that the proposed optimization method is a promising alternative to assist PROJECT managers in dealing with RCPSP.

Yearly Impact: مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 84

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 102 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesCitation 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesRefrence 0
Issue Info: 
  • Year: 

    2016
  • Volume: 

    3
  • Issue: 

    3
  • Pages: 

    1391-1412
Measures: 
  • Citations: 

    0
  • Views: 

    224
  • Downloads: 

    90
Abstract: 

This paper presents the formulation and solution of the Combinatorial Multi-Mode RESOURCE CONSTRAINED Multi-PROJECT SCHEDULING Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the PROJECT manager. The motivation for developing such an approach is due in part to practical situations where the definition of optimal changes on a regular basis. The proposed approach empowers the PROJECT manager to determine what is optimal, on a given day, under the current constraints, such as, change of priorities, lack of skilled worker. The proposed method utilizes a simulation approach to determine feasible solutions, under the current constraints. RESOURCEs can be non-consumable, consumable, or doubly CONSTRAINED. The paper also presents a real-life case study dealing with SCHEDULING of ship repair activities.

Yearly Impact: مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 224

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 90 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesCitation 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesRefrence 0
Author(s): 

CHEN P.H. | WENG H.

Issue Info: 
  • Year: 

    2009
  • Volume: 

    18
  • Issue: 

    -
  • Pages: 

    485-498
Measures: 
  • Citations: 

    1
  • Views: 

    137
  • Downloads: 

    0
Keywords: 
Abstract: 

Yearly Impact: مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 137

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesCitation 1 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesRefrence 0
Issue Info: 
  • Year: 

    2008
  • Volume: 

    1
Measures: 
  • Views: 

    198
  • Downloads: 

    58
Abstract: 

IN THIS PAPER, FIRST A FUZZY RANDOM RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM IS PRESENTED. IN THIS MODEL, DURATION OF PROJECT ACTIVITIES IS A FUZZY RANDOM VARIABLE. THEN THE PROPOSED MODEL IS FORMULATED BY EXPECTED VALUE OF FUZZY RANDOM VARIABLE AND INTEGER PROGRAMMING. THE OBJECT OF THE PROBLEM IS TO FIND OPTIMAL SCHEDULING OF PROJECT ACTIVITIES. AN ILLUSTRATIVE EXAMPLE IS ALSO PROVIDED TO CLARIFY THE CONCEPT.

Yearly Impact:   مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 198

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 58
litScript
telegram sharing button
whatsapp sharing button
linkedin sharing button
twitter sharing button
email sharing button
email sharing button
email sharing button
sharethis sharing button