IRAN BANDAR, LOCATED AT THE SOUTHWEST CORNER OF POZM PLATEAU ON THE WESTERN SIDE OF THE GULF OF CHABAHAR WAS CONSTRUCTED IN 1978 BY BROWN ANDREW COMPANY AS A LOGISTIC BERTH LOCATION FOR IMPORTING THE EQUIPMENT OF THE LARGE MILITARY BERTH OF CHABAHAR. IN THE PRIMARY BERTH MODEL FOR MORE PROPERTY PRESERVATION IN THE FOUR-MONTH PERIOD OF MONSOONS, A 50-METER LONG BREAKWATER WAS CONSIDERED. AFTER THE ISLAMIC REVOLUTION, SINCE THE APPLICATION OF THE PORT HAD CHANGED AND THE LOGISTIC BERTH WAS TURNED INTO A COMMERCIAL – MILITARY BERTH, THE MODEL WAS BASICALLY CHANGED AND THE NECESSITY OF THE LONG BREAKWATER WAS IDENTIFIED. IN THIS REGARD, SOME RECOMMENDATIONS WERE PROVIDER FROM THE PROJECT'S EMPLOYER AND CONSULTANT, AND BECAUSE OF THE SIGNIFICANCE OF THIS PROJECT, IT WAS GIVEN TO THE DENMARK HYDRAULICS INSTITUTE. THIS INSTITUTE, WITH ITS PROFILE IN STUDIES OF THIS FIELD, HAS CONTROLLED THE WAVES OF THE PROPOSED AREA BY A MATHEMATICAL MODELING, WHILE IT HAS HYDRAULICALLY CONSTRUCTED THE MODEL AND SIMULTANEOUSLY TESTED THE BREAKWATER'S SECTION. AFTER CONSULTING THE EMPLOYER, THE LENGTH, DIRECTION AND THE CHARACTERISTICS OF THE BREAKWATER'S SECTION WERE DETERMINED (IN DIFFERENT LOCATIONS). THE PROPOSED MODEL WAS REVIEWED IN AN APPLICATORY POINT OF VIEW, AND BY CONSIDERING THE CHARACTERISTICS AND THE CONDITIONS OF LOCAL ROCKS AND BY THE EXPERIENCES OF USING DIFFERENT ROCKS IN OTHER CONSTRUCTED BREAKWATERS OF THE AREA. CONSIDERING THE EXISTING PIER'S CONDITION AND THE CONDITION OF THE PREVIOUSLY DREDGED CANAL, THE MODEL CHANGED SO THAT WHILE PROVIDING THE ESSENTIAL PRESERVATION, THE LENGTH CAN ALSO BE INCREASED.