مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

175
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Risk analysis of water and wastewater infrastructure projects based on publicprivate partnership (3P) approach by combining Fuzzy Delphi (FD), FMEA and artificial fuzzy assessment (FSE) techniques

Pages

  77-100

Abstract

 In recent years, the use of Public-Private-Partnerships (3P) approach to the implementation of infrastructure projects has received much attention. Risk identification and analysis in these projects has always been one of the main challenges of this approach. The purpose of this paper is to determine the different levels of risk in 3P water and wastewater projects in Iran using library studies and field surveys. Using a threephase protocol and developing an integrated method of Risk Analysis, while identifying and separating risks, different levels of risk in these projects were evaluated. In the first phase, 49 risk factors were identified and divided into 6 main groups including technical(R1), economic(R2), political(R3), legal(R4), environmental(R5) and managerial (R6) risks. In the second phase, in order to extract more critical risks, the risks were analyzed and screened by combining Fuzzy Delphi (FD) techniques and Failure Mode Analysis and Effects (FMEA) using the opinions of experts. Based on the results, 23 sub-risk factors with RPNNormalized values greater than 0. 5 were identified as critical risks. In the third phase, different levels of total risks (ORL) were determined by Fuzzy synthetic evaluation (FSE) method in combination with FMEA method. Based on the results of risk groups R2, R1, R3, R4, R6 and R5 with ORL of 7. 468, 7. 262, 7. 132, 6. 992, 6. 815 and 6. 670, respectively, as the most critical risk groups in 3P water projects. And sewage were identified. Risks of allocating financial resources and investor obligations (R2-6), lack of transparency in executive issues and changes in project specifications(R1-1), problems of the government system process in concluding the contract(R3-5), prolongation of licenses and their renewal( R4-6), integrated management, control and utilization of water resources(R6-8) and climate change and rainfall pattern(R5-2) in each of the above groups were identified as the most important critical risk factor. Finally, the ORL value of 3P water and sewage projects in the country was set at 7. 077, which indicates the high level of total risk of these projects.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    Khoshnevis, Mehrdad, Alemi, Faramarz, & SARRAF, AMIRPOUYA. (2023). Risk analysis of water and wastewater infrastructure projects based on publicprivate partnership (3P) approach by combining Fuzzy Delphi (FD), FMEA and artificial fuzzy assessment (FSE) techniques. JOURNAL OF STRUCTURAL AND CONSTRUCTION ENGINEERING, 9(11 ), 77-100. SID. https://sid.ir/paper/1033824/en

    Vancouver: Copy

    Khoshnevis Mehrdad, Alemi Faramarz, SARRAF AMIRPOUYA. Risk analysis of water and wastewater infrastructure projects based on publicprivate partnership (3P) approach by combining Fuzzy Delphi (FD), FMEA and artificial fuzzy assessment (FSE) techniques. JOURNAL OF STRUCTURAL AND CONSTRUCTION ENGINEERING[Internet]. 2023;9(11 ):77-100. Available from: https://sid.ir/paper/1033824/en

    IEEE: Copy

    Mehrdad Khoshnevis, Faramarz Alemi, and AMIRPOUYA SARRAF, “Risk analysis of water and wastewater infrastructure projects based on publicprivate partnership (3P) approach by combining Fuzzy Delphi (FD), FMEA and artificial fuzzy assessment (FSE) techniques,” JOURNAL OF STRUCTURAL AND CONSTRUCTION ENGINEERING, vol. 9, no. 11 , pp. 77–100, 2023, [Online]. Available: https://sid.ir/paper/1033824/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button