Information Journal Paper
APA:
CopyJAFARI, AHMAD, EBRAHIMI DENJKOULAEI, A., & GHOLAMNEZHAD, J.. (2011). A MATHEMATICAL MODEL FOR SHORT TERM PRODUCTION SCHEDULING IN OPEN PIT MINES BASED ON INTEGER PROGRAMMING. IRANIAN JOURNAL OF MINING ENGINEERING (IRJME), 5(10), 81-90. SID. https://sid.ir/paper/117136/en
Vancouver:
CopyJAFARI AHMAD, EBRAHIMI DENJKOULAEI A., GHOLAMNEZHAD J.. A MATHEMATICAL MODEL FOR SHORT TERM PRODUCTION SCHEDULING IN OPEN PIT MINES BASED ON INTEGER PROGRAMMING. IRANIAN JOURNAL OF MINING ENGINEERING (IRJME)[Internet]. 2011;5(10):81-90. Available from: https://sid.ir/paper/117136/en
IEEE:
CopyAHMAD JAFARI, A. EBRAHIMI DENJKOULAEI, and J. GHOLAMNEZHAD, “A MATHEMATICAL MODEL FOR SHORT TERM PRODUCTION SCHEDULING IN OPEN PIT MINES BASED ON INTEGER PROGRAMMING,” IRANIAN JOURNAL OF MINING ENGINEERING (IRJME), vol. 5, no. 10, pp. 81–90, 2011, [Online]. Available: https://sid.ir/paper/117136/en