مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

730
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Simultaneous Optimization of Underground Mine Layout and Production Scheduling In Sublevel Stoping Method

Pages

  81-90

Abstract

 As the demand for mineral resources increases, the need to underground mining is promoted and due to technological advances, deeper deposits with lower grade mineralization are becoming valuable. In underground operations, it is common practice that each area is planned individually. As these techniques often ignore how designing and planning one section can affect other sections, , optimum individual planning fails to provide an overall optimum design. In recent years, there has been a growing interest in simultaneous optimization that may assist with integrating different areas of the mine planning process and providing more profitable mines plans. In this paper, a mathematical IP model has been developed that simultaneously optimizes stope layout designs and production schedules for sublevel stoping (SLS) iron ore operations, and it is demonstrated that an integrated scheduling method can produce the globally optimal scheduling result by taking into account all interactions that occur across the stope layout optimization and scheduling. In this case, the application of the optimal integrated scheduling approach increases final NPV by 16 percent in comparison with the isolated approach.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    Foroughi, Sorayya, KHADEMI HAMIDI, JAFAR, Monjezi, Masud, & Nehring, Micah. (2019). Simultaneous Optimization of Underground Mine Layout and Production Scheduling In Sublevel Stoping Method. IRANIAN JOURNAL OF MINING ENGINEERING (IRJME), 14(43 ), 81-90. SID. https://sid.ir/paper/117171/en

    Vancouver: Copy

    Foroughi Sorayya, KHADEMI HAMIDI JAFAR, Monjezi Masud, Nehring Micah. Simultaneous Optimization of Underground Mine Layout and Production Scheduling In Sublevel Stoping Method. IRANIAN JOURNAL OF MINING ENGINEERING (IRJME)[Internet]. 2019;14(43 ):81-90. Available from: https://sid.ir/paper/117171/en

    IEEE: Copy

    Sorayya Foroughi, JAFAR KHADEMI HAMIDI, Masud Monjezi, and Micah Nehring, “Simultaneous Optimization of Underground Mine Layout and Production Scheduling In Sublevel Stoping Method,” IRANIAN JOURNAL OF MINING ENGINEERING (IRJME), vol. 14, no. 43 , pp. 81–90, 2019, [Online]. Available: https://sid.ir/paper/117171/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button